Propuesta de plan de mantenimiento basado en RCM (Mantenimiento basado en confiabilidad) para los transformadores de potencia dispuestos en las subestaciones de la empresa ESSA.
dc.contributor.advisor | Rincón Sanabria, Rolando Andrés | |
dc.contributor.advisor | Quiroga Quiroga, Oscar Arnulfo | |
dc.contributor.author | Gómez Vega, Juan José | |
dc.contributor.evaluator | Diaz Florez, Guillermo Andres | |
dc.contributor.evaluator | Chacon Velasco, Julio Cesar | |
dc.date.accessioned | 2025-09-09T18:23:11Z | |
dc.date.available | 2025-09-09T18:23:11Z | |
dc.date.created | 2025-03-27 | |
dc.date.issued | 2025-07-09 | |
dc.description.abstract | Este proyecto plantea una propuesta de plan de mantenimiento optimizado para los transformadores de potencia en las subestaciones de ESSA, basado en la metodología RCM (Mantenimiento Basado en Confiabilidad) y usando la herramienta AMFE (Análisis de Modos Fallas y Efectos). A través de la recolección y análisis de datos históricos de fallas, se estableció un histórico actualizable, permitiendo identificar tendencias y optimizar la programación de mantenimiento. Como resultado, se diseñó una Política de Atención de Fallas, alineada con normativas como la SAE JA1011 y JA1012, que establece criterios para la gestión de eventos críticos, priorizando acciones correctivas según la criticidad de cada falla. Además, se implementaron hojas de ruta para mantenimiento preventivo y predictivo, listas de chequeo y un enfoque estructurado para la sustitución y restauración programada de componentes clave, incluyendo la regeneración de aceite dieléctrico. La validación del proyecto mostró una mejora significativa en la gestión del mantenimiento, optimizando recursos y reduciendo fallas inhabilitantes. Esta implementación representa un avance en la confiabilidad operativa de los transformadores, asegurando una mayor eficiencia en la planificación de las intervenciones y garantizando la continuidad del suministro eléctrico. Palabras clave: Mantenimiento optimizado, transformadores de potencia, RCM, AMFE, política de atención de fallas, mantenimiento preventivo, mantenimiento predictivo, confiabilidad operativa, suministro eléctrico. | |
dc.description.abstractenglish | This project proposes an optimized maintenance plan for power transformers in ESSA's substations, based on the RCM (Reliability Based Maintenance) methodology and using the FMEA (Failure Modes and Effects Analysis) tool. Through the collection and analysis of historical failure data, an updatable history was established, allowing to identify trends and optimize maintenance scheduling. As a result, a Failure Attention Policy was designed, aligned with standards such as SAE JA1011 and JA1012, which establishes criteria for the management of critical events, prioritizing corrective actions according to the criticality of each failure. In addition, preventive and predictive maintenance roadmaps, checklists and a structured approach for scheduled replacement and refurbishment of key components, including dielectric oil regeneration, were implemented. Validation of the project showed a significant improvement in maintenance management, optimizing resources and reducing disabling failures. This implementation represents an advance in the operational reliability of the transformers, ensuring greater efficiency in the planning of interventions and guaranteeing the continuity of electricity supply. Keywords: Optimized maintenance, power transformers, RCM, FMEA, failure attention policy, preventive maintenance, predictive maintenance, operational reliability, power supply. | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Ingeniero Electricista | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/46211 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingeníerias Fisicomecánicas | |
dc.publisher.program | Ingeniería Eléctrica | |
dc.publisher.school | Escuela de Ingenierías Eléctrica, Electrónica y Telecomunicaciones | |
dc.rights | info:eu-repo/semantics/closedAccess | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0/ | |
dc.title | Propuesta de plan de mantenimiento basado en RCM (Mantenimiento basado en confiabilidad) para los transformadores de potencia dispuestos en las subestaciones de la empresa ESSA. | |
dc.title.english | Proposal for an RCM-based maintenance plan for power transformers located in ESSA substations | |
dc.type.coar | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 337.21 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 629.85 KB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 2.18 KB
- Format:
- Item-specific license agreed to upon submission
- Description: