Estrategia de mantenimiento para la nueva planta de gas de Ecopetrol s.a cpf de cupiagua
dc.contributor.advisor | Giraldo García, Luis Rodrigo | |
dc.contributor.author | Rodríguez Muñoz, Orlando | |
dc.contributor.author | Torres Beltrán, Alexander | |
dc.contributor.author | Turca Rodríguez, Wilson | |
dc.date.accessioned | 2024-03-03T19:39:53Z | |
dc.date.available | 2012 | |
dc.date.available | 2024-03-03T19:39:53Z | |
dc.date.created | 2012 | |
dc.date.issued | 2012 | |
dc.description.abstract | La Nueva Planta de Gas de Cupiagua (PGC) en el Departamento de Casanare cuenta con una capacidad de producción de 240 millones de pies cúbicos de gas. La PGC está considerada como un medio de trabajo altamente peligroso, la estrategia de mantenimiento planteada esta dirigida a mitigar el riesgo a valores tan bajos que sean aceptables, de tal manera que trabajemos de una manera segura sin impactar la Vida, al Medio Ambiente y a los Activos. Con el objetivo de obtener una cobertura total a los equipos de la planta se presenta la descripción de la metodología aplicada para desarrollar una estrategia de Mantenimiento Integral basada en los conceptos de RCM y RBI, con los cuales se logra establecer una estrategia de mantenimiento compacta, confiable y segura para asegurar su alta disponibilidad. El desarrollo del estudio RCM esta basado en la clasificación de equipos, en el análisis de la criticidad e impacto de estos y cada componente sobre la planta, para este fin se siguió la metodología ABC. Una vez definida la clasificación, nos hemos basado en estudios de aplicación de la metodología FMECA para lograr establecer las rutinas y planes de mantenimiento de los principales componentes. De igual manera consideramos la aplicación del RBI, para lograrlo nos apoyamos en el Estándar de Ecopetrol de Administración de la Seguridad de los Procesos, (ECP-DHS-G-019), el cual también contempla la Integridad Mecánica y el Aseguramiento de la Calidad, este se apoya principalmente en la aplicación de estándares del API RBI 580-2009 y del API RBI-581 del 2008, los cuales estudian la Administración del Riesgo considerando las consecuencias de las fallas para mitigarlo. Estas dos herramientas conforman una poderosa combinación que nos permitirán optimizar los programas de mantenimiento, aumentando la vida de los activos dentro de su Ciclo de Vida con lo cual esperamos dar un muy buen soporte en la Gestión del Mantenimiento en la nueva PGC. | |
dc.description.abstractenglish | The New Gas Plant Cupiagua (PGC) in the Department of Casanare has a production capacity of 240 million cubic feet of gas. The PGC is considered a highly dangerous working environment, raised the maintenance strategy is aimed at mitigating the risk to such low values that are acceptable, so we work in a safe manner without impacting the Life, the Environment and Assets. In order to obtain a full coverage of the plant equipment is a description of the methodology used to develop a comprehensive maintenance strategy based on the concepts of RCM and RBI, with which it can establish a maintenance strategy compact reliable and safe to ensure high availability. The development of RCM study is based on the classification of equipment, analysis of criticality and impact of these and every component on the ground, for this purpose, the methodology followed ABC. After defining the classification, we have relied on studies FMECA methodology application to achieve set routines and maintenance plans of the main components. Similarly we consider the application of RBI, to do we rely on Ecopetrol Standard Security Management Process (ECP-DHS-G-019), which also includes the Mechanical Integrity and Quality Assurance This is mostly based on the application of standards and API API 580-2009 RBI RBI-581 of 2008, which Risk Management study considering the consequences of failure to mitigate. These two tools form a powerful combination that will allow us to optimize maintenance schedules, increasing the life of the assets within its life cycle which will hopefully give a very good support in the maintenance management in the new PGC. | |
dc.description.degreelevel | Especialización | |
dc.description.degreename | Especialista en Gerencia de Mantenimiento | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/27737 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
dc.publisher.program | Especialización en Gerencia de Mantenimiento | |
dc.publisher.school | Escuela de Ingeniería Mecánica | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | Estrategia De Mantenimiento Basada En RCM Y RBI | |
dc.subject.keyword | Maintenance Strategy Based Rcm And Rbi | |
dc.title | Estrategia de mantenimiento para la nueva planta de gas de Ecopetrol s.a cpf de cupiagua | |
dc.title.english | Maintenance strategy for new gas plant ecopetrol sa, cpf cupiagua | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 573.13 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 365.87 KB
- Format:
- Adobe Portable Document Format