Impacto de las Restricciones de Inercia en el Despacho Hidrotérmico

dc.contributor.advisorSerna Suarez, Ivan David
dc.contributor.advisorParada Mayorga, Pilar Tatiana
dc.contributor.authorRodriguez Rico, Laura Marcela
dc.contributor.authorCamargo Cuesta, Natalia Sandrith
dc.contributor.evaluatorOrozco Henao, Cesar Agusto
dc.contributor.evaluatorDiaz Florez, Guillermo Andrés
dc.date.accessioned2025-08-27T12:46:07Z
dc.date.available2025-08-27T12:46:07Z
dc.date.created2025-08-25
dc.date.embargoEnd2030-08-25
dc.date.issued2025-08-25
dc.description.abstractEste trabajo analiza el impacto de las restricciones de inercia en el despacho hidrotérmico cuando se integran Energías Renovables No Convencionales (ERNC) al sistema eléctrico. Para esto se implementó un modelo matemático desarrollado en AMPL que incorpora ecuaciones para garantizar la estabilidad de frecuencia, considerando factores como la Tasa de Cambio de Frecuencia (RoCoF), el estatismo de los generadores y los desbalances de potencia. Se estudia cómo la creciente penetración de energías renovables, que no aportan inercia al sistema, afecta la estabilidad de frecuencia y los costos operativos. La metodología implementa secuencialmente un Despacho Económico (DE), un modelo de Unit Commitment (UC) y finalmente un redespacho considerando restricciones de inercia. Se evaluaron cuatro escenarios con distintos niveles de penetración renovable sobre el sistema de pruebas RTS de 24 barras de la IEEE (0%, 25%, 35% y 55%), analizando para cada caso el requerimiento de inercia, los costos operacionales y la potencia adicional requerida para mantener la frecuencia del sistema. Los resultados demuestran que a medida que aumenta la penetración de ERNC, se incrementan los requerimientos de inercia y los requerimientos de regulación de frecuencia. Para escenarios con alta penetración, se evidenciaron las limitaciones técnicas para integrar elevados porcentajes de generación renovable sin comprometer la estabilidad. Adicionalmente, se identificó que la ubicación topológica de los recursos de generación convencional tiene un impacto determinante en la magnitud de la fluctuación de frecuencia que puede presentarse en un nodo cualquiera, ya que los generadores que no se encuentran conectados directamente a barras con demanda o generación, no presentan un valor de potencia significativa en el redespacho.
dc.description.abstractenglishThis work analyzes the impact of inertia constraints on hydrothermal dispatch when integrating Non-Conventional Renewable Energy Sources (NCRES) into the electrical system. For this purpose, a mathematical model developed in AMPL was implemented, incorporating equations to guarantee frequency stability by considering factors such as Rate of Change of Frequency (RoCoF), generator droop characteristics, and power imbalances. The study examines how the increasing penetration of renewable energies, which do not contribute inertia to the system, affects frequency stability and operational costs. The methodology sequentially implements an Economic Dispatch (ED), a Unit Commitment (UC) model, and finally a redispatch considering inertia constraints. Four scenarios with different renewable penetration levels were evaluated on the IEEE 24-bus RTS test system (0%, 25%, 35%, and 55%), analyzing for each case the inertia requirements, operational costs, and additional power required to maintain system frequency. The results demonstrate that as NCRES penetration increases, both inertia requirements and frequency regulation requirements increase. For high penetration scenarios, technical limitations were evidenced for integrating high percentages of renewable generation without compromising stability. Additionally, it was identified that the topological location of conventional generation resources has a determining impact on the magnitude of frequency fluctuation that may occur at any given node, since generators that are not directly connected to buses with demand or generation do not present significant power values in the redispatch.
dc.description.degreelevelPregrado
dc.description.degreenameIngeniero Electricista
dc.format.mimetypeapplication/pdf
dc.identifier.instnameUniversidad Industrial de Santander
dc.identifier.reponameUniversidad Industrial de Santander
dc.identifier.repourlhttps://noesis.uis.edu.co
dc.identifier.urihttps://noesis.uis.edu.co/handle/20.500.14071/46029
dc.language.isospa
dc.publisherUniversidad Industrial de Santander
dc.publisher.facultyFacultad de Ingeníerias Fisicomecánicas
dc.publisher.programIngeniería Eléctrica
dc.publisher.schoolEscuela de Ingenierías Eléctrica, Electrónica y Telecomunicaciones
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rights.accessrightsinfo:eu-repo/semantics/openAccess
dc.rights.coarhttp://purl.org/coar/access_right/c_abf2
dc.rights.creativecommonsAtribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0)
dc.rights.licenseAtribución-NoComercial-SinDerivadas 2.5 Colombia (CC BY-NC-ND 2.5 CO)
dc.subjectInercia
dc.subjectDespacho Hidrotérmico
dc.subjectSistema de Potencia
dc.subjectEnergía Renovable
dc.subject.keywordInertia
dc.subject.keywordHydrothermal Dispatch
dc.subject.keywordPower System
dc.subject.keywordRenewable Energy
dc.titleImpacto de las Restricciones de Inercia en el Despacho Hidrotérmico
dc.title.englishImpact of Inertia Constraints in Hydrothermal Dispatch
dc.type.coarhttp://purl.org/coar/resource_type/c_7a1f
dc.type.hasversionhttp://purl.org/coar/version/c_b1a7d7d4d402bcce
dc.type.localTesis/Trabajo de grado - Monografía - Pregrado
Files
Original bundle
Now showing 1 - 5 of 5
No Thumbnail Available
Name:
Documento.pdf
Size:
3.85 MB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Carta de autorización.pdf
Size:
139.46 KB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Nota de proyecto.pdf
Size:
158.67 KB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Carta de confidencialidad.pdf
Size:
174.76 KB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Carta de autorización.pdf
Size:
159.28 KB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
2.18 KB
Format:
Item-specific license agreed to upon submission
Description: