DISEÑO DE LA PRIMERA FASE DE UN PLAN DE ACCIÓN CON BASE EN EL PROGRAMA DE USO RACIONAL Y EFICIENTE DE LA ENERGÍA PARA LAS INSTALACIONES ADMINISTRATIVAS Y OPERATIVAS DE LA SEDE PRINCIPAL DE TRANSPIEDECUESTA.
dc.contributor.advisor | Ortíz Rangel, Manuel José | |
dc.contributor.advisor | Ordoñez Plata, Gabriel | |
dc.contributor.author | Pérez Medina, Erikd Abdul | |
dc.contributor.author | González León, Leyder Estivel | |
dc.contributor.evaluator | Rincón Saravia, Rolando Andrés | |
dc.contributor.evaluator | Cárdenas Rangel, Jorge Luis | |
dc.date.accessioned | 2023-03-01T14:23:25Z | |
dc.date.available | 2023-03-01T14:23:25Z | |
dc.date.created | 2023-02-28 | |
dc.date.issued | 2023-02-28 | |
dc.description.abstract | Como se menciona en la introducción, este proyecto es un programa de uso racional y eficiente de la energía en la sede administrativa y operativa de Transpiedecuesta ubicada en el Km 2 de la vía Piedecuesta – San Gil. La consideración del buen uso de la energía eléctrica es el punto de partida, debido a la poca concientización y la falta de información sobre lo que implica la eficiencia energética a la hora de hacer uso de la energía eléctrica, por ende, se opta por el diseño de un programa de uso racional y eficiente de la energía (URE), el cual como una guía y un proceso persistente dará una contribución sustancial, tanto en las personas como en la facturación del servicio de electricidad. Se tomará como punto de partida la información y datos del sistema eléctrico existente, se evidenciarán las causas de la ineficiencia energética, así como los elementos tales como, equipos de aire acondicionado, luminarias, equipos de informática entre otros, que puedan propiciar un uso de energía mayor del que se necesita en óptimas condiciones. Se presentarán soluciones para las problemáticas existentes más relevante en cuanto a los parámetros de uso de la energía y la eficiencia energética de la sede principal de Transpiedecuesta, así como sensibilidad del personal administrativo y operativo para la toma de conciencia del uso adecuado de la energía eléctrica, con el fin de reducir el costo de la energía eléctrica, y favorecer el autoconsumo y la exportación de excedentes de energía producida por el sistema de generación fotovoltaica recientemente instalado. | |
dc.description.abstractenglish | As mentioned in the introduction, this project is a program for the rational and efficient use of energy at the administrative and operational headquarters of Transpiedecuesta located at Km 2 of the Piedecuesta - San Gil road. The consideration of the proper use of electrical energy is the starting point, due to the lack of awareness and the lack of information about what energy efficiency implies when making use of electrical energy, therefore, the option is chosen. design of a program for the rational and efficient use of energy (URE), which as a guide and a persistent process will give a substantial contribution, both in people and in the billing of the electricity service. The information and data of the existing electrical system will be taken as a starting point, the causes of energy inefficiency will be evidenced, as well as elements such as air conditioning equipment, lighting, computer equipment, among others, that may promote the use of more energy than is needed under optimal conditions. Solutions will be presented for the most relevant existing problems in terms of the parameters of energy use and energy efficiency of the main headquarters of Transpiedecuesta, as well as the sensitivity of the administrative and operational staff to raise awareness of the proper use of electrical energy. , in order to reduce the cost of electrical energy, and promote self-consumption and the export of surplus energy produced by the recently installed photovoltaic generation system. | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Ingeniero Electricista | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/12328 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingeníerias Fisicomecánicas | |
dc.publisher.program | Ingeniería Eléctrica | |
dc.publisher.school | Escuela de Ingenierías Eléctrica, Electrónica y Telecomunicaciones | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.subject | URE | |
dc.subject | USO EFICIENTE DE LA ENERGIA | |
dc.subject | ENERGÍA | |
dc.subject | TRANSPIEDECUESTA | |
dc.subject.keyword | URE | |
dc.subject.keyword | EFFICIENT USE OF ENERGY | |
dc.subject.keyword | ENERGY | |
dc.subject.keyword | TRANSPIEDECUESTA | |
dc.title | DISEÑO DE LA PRIMERA FASE DE UN PLAN DE ACCIÓN CON BASE EN EL PROGRAMA DE USO RACIONAL Y EFICIENTE DE LA ENERGÍA PARA LAS INSTALACIONES ADMINISTRATIVAS Y OPERATIVAS DE LA SEDE PRINCIPAL DE TRANSPIEDECUESTA. | |
dc.title.english | DESIGN OF THE FIRST PHASE OF AN ACTION PLAN BASED ON THE PROGRAM FOR THE RATIONAL AND EFFICIENT USE OF ENERGY FOR THE ADMINISTRATIVE AND OPERATIONAL FACILITIES OF THE MAIN HEADQUARTERS OF TRANSPIEDECUESTA. | |
dc.type.coar | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
dspace.entity.type |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 135.77 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 123.7 KB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 2.18 KB
- Format:
- Item-specific license agreed to upon submission
- Description: