Auxiliar De Ingeniería Para La Estimación De Costos y Presupuestos Para La Planificación De Estructuras Metálicas En La Empresa Peralta Ingeniería SAS
dc.contributor.advisor | Torrado Gomez Luz Marina | |
dc.contributor.advisor | Jaime Rojas Olga Yurani | |
dc.contributor.author | Peralta Padilla Harold Santiago | |
dc.contributor.evaluator | Villamizar Amaya Sandra Rocio | |
dc.contributor.evaluator | Viviescas Jaimes Alvaro | |
dc.date.accessioned | 2025-03-07T13:56:52Z | |
dc.date.available | 2025-03-07T13:56:52Z | |
dc.date.created | 0016-02-25 | |
dc.date.issued | 0016-02-25 | |
dc.description.abstract | La planificación y estimación de costos en estructuras metálicas es fundamental para la viabilidad de los proyectos de construcción; ya que ayuda en la reducción de los márgenes de error de los presupuestos, evitando principalmente el mal gasto de la materia prima y los sobrecostos en los proyectos. Este trabajo (desarrolló o implementó) una metodología para la cuantificación de los costos y materiales en la empresa Peralta Ingeniería SAS, optimizando la precisión de estos, mediante el uso del software Tekla Structures y Excel. Se Analizó cada proyecto asignado para recopilar la información necesaria para la estimación de costos, se optimizó con mayor precisión las cantidades de una estructura metálica mediante el uso de software de tabulación y modelado, se identificó las variables que tienen mayor impacto en los presupuestos de obras en estructuras metálicas y se apoyó a la planificación de la fabricación y el montaje mediante el análisis de precios unitarios. Para esto, fue necesario considerar factores como son la disponibilidad de perfiles comerciales, el tipo de recubrimiento anticorrosivo y las condiciones de montaje, entre otros. Se determinó un costo promedio de $7.500/kg, con variaciones de hasta un 100% dependiendo de la disponibilidad de perfiles y el tipo de limpieza superficial que se requiera. Los resultados mostraron que el costo unitario por kilogramo de estructura instalada varía según el sistema de protección contra la corrosión, la eficiencia del montaje y la elección de materiales a utilizar en el proyecto. Además, se evidencia que la implementación de herramientas BIM mejora la precisión en la planificación, la selección de materiales, los cuales ayudan a optimizar los sistemas de protección anticorrosión de la estructura, como a reducir los costos impactando significativamente en la rentabilidad de los proyectos. | |
dc.description.abstractenglish | Planning and estimating costs in metal structures is essential for the viability of construction projects; as it helps in reducing the error margins of budgets, mainly avoiding the poor expenditure of raw materials and cost overruns in projects. This work (developed or implemented) a methodology for the quantification of costs and materials in the company Peralta Ingeniería SAS, optimizing their accuracy, through the use of Tekla Structures and Excel software. Each assigned project was analyzed to collect the necessary information for cost estimation, the quantities of a metal structure were optimized with greater precision through the use of tabulation and modeling software, the variables that have the greatest impact on budgets for works in metal structures were identified, and manufacturing and assembly planning was supported through the analysis of unit prices. For this, it was necessary to consider factors such as the availability of commercial profiles, the type of anticorrosive coating and the assembly conditions, among others. An average cost of $7,500/kg was determined, with variations of up to 100% depending on the availability of profiles and the type of surface cleaning required. The results showed that the unit cost per kilogram of installed structure varies depending on the corrosion protection system, the assembly efficiency and the choice of materials to be used in the project. In addition, it is evident that the implementation of BIM tools improves the precision in planning, the selection of materials, which help to optimize the structure's anti-corrosion protection systems, as well as reduce costs, significantly impacting the profitability of the projects. | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Ingeniero Civil | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/45303 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingeníerias Fisicomecánicas | |
dc.publisher.program | Ingeniería Civil | |
dc.publisher.school | Escuela de Ingenieria Civil | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Atribución-NoComercial-SinDerivadas 2.5 Colombia (CC BY-NC-ND 2.5 CO) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.subject | Costos | |
dc.subject | Gestión | |
dc.subject | Incidencia | |
dc.subject | Proyección | |
dc.subject | Variables | |
dc.subject | Preparación de superficie | |
dc.subject | Intemperie | |
dc.subject | Limpieza | |
dc.subject.keyword | Costs | |
dc.subject.keyword | Management | |
dc.subject.keyword | Incidence | |
dc.subject.keyword | Projection | |
dc.subject.keyword | Budget | |
dc.subject.keyword | Variables | |
dc.subject.keyword | Surface preparation | |
dc.subject.keyword | Outdoor | |
dc.subject.keyword | Cleaning | |
dc.title | Auxiliar De Ingeniería Para La Estimación De Costos y Presupuestos Para La Planificación De Estructuras Metálicas En La Empresa Peralta Ingeniería SAS | |
dc.title.english | Engineering Assistant for Estimating Costs and Budgets for the Planning of Metallic Structures at the Company Peralta Ingeniería SAS | |
dc.type.coar | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta-Autorizacion-Uso.pdf
- Size:
- 90.58 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 219.54 KB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 2.18 KB
- Format:
- Item-specific license agreed to upon submission
- Description: