Mejoramiento de los Procesos de Mantenimiento Preventivo del Taller Automotriz de la Planta de Concreto de Cemex en Bello, Antioquia
dc.contributor.advisor | Ortiz Pimientos, Nestor Raul | |
dc.contributor.author | Torres Duran, Fenix Andrea. | |
dc.contributor.evaluator | Diaz Bohorquez, Carlos Eduardo | |
dc.contributor.evaluator | Jacome Cabrales, Ruben Dario | |
dc.date.accessioned | 2023-08-14T17:06:18Z | |
dc.date.available | 2023-08-14T17:06:18Z | |
dc.date.created | 2023-08-13 | |
dc.date.embargoEnd | 2030-08-12 | |
dc.date.issued | 2023-08-13 | |
dc.description.abstract | Cemex concreto premezclado, Colombia, se caracteriza por la calidad en sus productos y por la importancia de hacer entrega oportuna a sus clientes, donde una de sus prioridades es garantizar la condición operativa de sus camiones revolvedores. Es por esto que, el área de mantenimiento automotriz destaca la necesidad de ejecutar de manera óptima y eficaz la intervención del mantenimiento preventivo y correctivos en cada uno de sus vehículos. Actualmente, para Antioquia, operan 3 plantas de concreto premezclado ubicadas en: La Estrella, Bello y Rionegro, cada planta cuenta con una disponibilidad de camiones según corresponda al volumen de producción estandarizado. Este proyecto tiene como pilar mejorar la ejecución de los procesos de mantenimiento preventivo en el taller automotriz de la planta de Bello-Antioquia, lugar donde se encuentra el taller principal para poder intervenir los camiones revolvedores dentro de la zona de Antioquia. Dentro de los mantenimientos preventivos se encuentran cinco subgrupos que a su vez lo integran diferentes sistemas que nacen de las subdivisiones de los componentes principales de los camiones revolvedores. Durante la etapa diagnóstica de este proyecto se identifican los sistemas que demandaban mayor tiempo de ejecución sobre los cuales se establecieron diferentes propuestas de mejora relacionadas con la búsqueda de reducir el lead time (tiempo en el proceso), en la ejecución de los mantenimientos preventivos por parte de los técnicos mecánicos garantizando así la optimización de los procesos bajo el principio de la salud y seguridad en el trabajo. | |
dc.description.abstractenglish | Cemex ready-mix concrete, Colombia, is characterized by the quality of its products and the importance of timely delivery to its customers, where one of its priorities is to ensure the operational condition of its ready-mix trucks. For this reason, the automotive maintenance area emphasizes the need to execute in an optimal and efficient way the intervention of preventive and corrective maintenance in each of its vehicles. Currently, for Antioquia, there are 3 ready-mix concrete plants located in: La Estrella, Bello and Rionegro, each plant has an availability of trucks according to correspond to the standardized production volume. The main objective of this project is to improve the execution of preventive maintenance processes in the automotive workshop of the Bello-Antioquia plant, where the main workshop is located in order to be able to intervene the ready-mix trucks in the Antioquia area. Within the preventive maintenance there are five subgroups that in turn integrate different systems that are born from the subdivisions of the main components of the scrambler trucks. During the diagnostic stage of this project, the systems that demanded more execution time were identified, on which different improvement proposals were established in order to reduce the lead time (time in the process) in the execution of preventive maintenance by the mechanical technicians, thus guarantee | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Ingeniero Industrial | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/14818 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingeníerias Fisicomecánicas | |
dc.publisher.program | Ingeniería Industrial | |
dc.publisher.school | Escuela de Estudios Industriales y Empresariales | |
dc.rights | info:eu-repo/semantics/embargoedAccess | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.subject | Camión revolvedor | |
dc.subject | Mantenimiento preventivo | |
dc.subject | Distribución de planta | |
dc.subject | Optimización de tiempo | |
dc.subject.keyword | Mixer Truck | |
dc.subject.keyword | Preventive Maintenance | |
dc.subject.keyword | Distribution plant | |
dc.subject.keyword | Time optimization | |
dc.subject.keyword | Ready-mix concrete | |
dc.title | Mejoramiento de los Procesos de Mantenimiento Preventivo del Taller Automotriz de la Planta de Concreto de Cemex en Bello, Antioquia | |
dc.title.english | Improvement of the Preventive Maintenance Processes of the Automotive Workshop of the Cemex Concrete Plant in Bello, Antioquia* | |
dc.type.coar | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 5 of 5
No Thumbnail Available
- Name:
- Documento.pdf
- Size:
- 898.59 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- CartaConfidencialidad.pdf
- Size:
- 161.78 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Carta Autorización.pdf
- Size:
- 144.29 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 539.1 KB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 2.18 KB
- Format:
- Item-specific license agreed to upon submission
- Description: