Plan de mejora para mayor aprovechamiento de gas en autogeneración en una estación de tratamiento de crudo en un campo petrolero del Magdalena Medio
dc.contributor.advisor | Osma Pinto, German Alfonso | |
dc.contributor.author | Bohórquez, Diego Fabián | |
dc.contributor.evaluator | García Navas, Edison Odilio | |
dc.contributor.evaluator | Calvete González, Fernando Enrique | |
dc.date.accessioned | 2023-08-03T18:56:48Z | |
dc.date.available | 2023-08-03T18:56:48Z | |
dc.date.created | 2023-07-20 | |
dc.date.issued | 2023-07-20 | |
dc.description.abstract | La oferta de gas en un campo del Magdalena Medio es consumida en los ramales de tratamiento termoeléctrico de crudo, autogeneración y quema en la tea; un análisis de la operación ha establecido oportunidades de aumento de la autogeneración del Campo. La Resolución 40066 del 11 de febrero de 2022 establece auditorias tendientes a verificar la quema de gases en tea de manera periódica. En este sentido, el presente documento establece un plan de incremento de autogeneración, basado en la instalación de sistemas de control automático. Para esto, el plan definió los flujos en exceso que pueden ser aprovechados, definiendo los aspectos técnicos, ambientales y económicos; asimismo, el plan fue evaluado económica y ambientalmente, considerando tres escenarios de aprovechamiento. Según los resultados, el exceso de gas de quema a la tea presenta un potencial de transformación en generación eléctrica de 1 MWh/día. Este potencial fue definido como el Escenario 1, el cual envuelve la compra de 2 generadores de 0.2 MWh, incrementando también a 100% la capacidad operativa de los generadores instalados en el Campo; este escenario define un flujo de 572.1 KPCED para el ramal de autogeneración, de 282.4 KPCED para el ramal de tratamiento y de 86.4 KPCED para quema a tea. De otro lado, el Escenario 2, envuelve la compra de 1 generador de 0.2 MWh aprovechando el 71% del potencial, mientras el Escenario 3 aprovecha el 43% del potencial. La factibilidad económica fue verificada en los tres escenarios a pesar de una prospectiva de oferta de gas de solo 5 años, del 2023 al 2027. Los beneficios financieros de la implementación del plan de mejoramiento en el Escenario 1, según los pronósticos de producción de gas, fueron estimados en VPN de $ 1,619.1 Musd, TIR de 1,081 %, ROI de 1,813% y un PB de 2.0 meses. | |
dc.description.abstractenglish | Supply of gas in a Magdalena Medio field is consumed in the operations of thermoelectric treatment of crude oil, self-generation and burning in the torch. An analysis of the operation has established opportunities to increase the self-generation in the Field. Resolution 40066 of February 11th of 2022 establishes verification and control of the burning of gases in torches. Therefore, this document propones a plan to increase self-generation, based on the installation of automatic control systems. For this, the plan calculated the excess flows that can be used, defining technical, environmental, and economic aspects. Likewise, the plan was economically and environmentally evaluated, considering three use scenarios. According to the results, the excess gas from burning the torch has a potential for transformation into 1 MWh/day of electricity. This potential was defined as Scenario 1, which involves purchase of two 0.2 MWh generators, as well as increasing operating capacity of the installed generators to 100%. This scenario defines a flow of 572.1 KSCFD for the self-generation, 282.4 KSCFD for the crude-oil treatment and 86.4 KSCFD for burning in torch. On the other hand, Scenario 2 involves the purchase of a 0.2 MWh generator, considering 71% of the potential, while Scenario 3 takes advantage of 43% of the potential. Economic feasibility was verified in all three scenarios despite a gas supply prospective of only 5 years, from 2023 to 2027. The financial benefits of implementing the plan according to Scenario 1 were estimated at a NPV of $1,619.1 Musd, IRR of 1,081%, ROI of 1,813% and a PayBack of 2.0 months, based on gas production forecasts. | |
dc.description.degreelevel | Maestría | |
dc.description.degreename | Magíster en Ingeniería de Petróleos y Gas | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/14688 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingeníerias Fisicoquímicas | |
dc.publisher.program | Maestría en Ingeniería de Petróleos y Gas | |
dc.publisher.school | Escuela de Ingeniería de Petróleos | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.subject | Generación | |
dc.subject | Gas natural | |
dc.subject | Magdalena Medio | |
dc.subject | Tea | |
dc.subject | Resolución 40066 | |
dc.subject | Sistema de control | |
dc.subject.keyword | Generation | |
dc.subject.keyword | Natural Gas | |
dc.subject.keyword | Magdalena Medio | |
dc.subject.keyword | Flaring | |
dc.subject.keyword | Resolution Law 40066 | |
dc.subject.keyword | Control System | |
dc.title | Plan de mejora para mayor aprovechamiento de gas en autogeneración en una estación de tratamiento de crudo en un campo petrolero del Magdalena Medio | |
dc.title.english | Improvement Plan for a Greater Use of Gas in Self-Generation in a Crude Treatment Station in an Oil Field of Magdalena Medio | |
dc.type.coar | http://purl.org/coar/resource_type/c_bdcc | |
dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Maestría |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 152.02 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 188.06 KB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 2.18 KB
- Format:
- Item-specific license agreed to upon submission
- Description: