Diseño de la estación para la medición del caudal del vertedero de excesos del embalse Bucaramanga
dc.contributor.advisor | Almeyda Ortiz, Andres | |
dc.contributor.author | Santana López, Juan Pablo | |
dc.contributor.author | Diaz Diaz, Julio Cesar | |
dc.date.accessioned | 2024-03-04T00:41:30Z | |
dc.date.available | 2020 | |
dc.date.available | 2024-03-04T00:41:30Z | |
dc.date.created | 2020 | |
dc.date.issued | 2020 | |
dc.description.abstract | El crecimiento demográfico mundial trae consigo problemas a las sociedades, ejemplificados por una parte en el suministro eficiente, oportuno y óptimo de servicios públicos; la solución a estas problemáticas se centra en una adecuada planeación y proyección de sistemas modernos que permitan garantizar el suministro de recursos; en este caso, por ejemplo, el suministro de agua implica una correcta gestión de recursos que contemple soluciones ingenieriles de intervención en espejos de agua tales como, lagunas, embalses, reservorios, etc. A nivel local existen dos entidades encargadas de la protección y gestión de los recursos hídricos para Bucaramanga y su área metropolitana estas son: la Corporación Autónoma Regional para la defensa de la Meseta de Bucaramanga (CDMB), y el Acueducto Metropolitano de Bucaramanga (AMB) S.A. E.S.P. Como propósito misional el acueducto proyecta garantizar el suministro de agua potable para los próximos 25 años a través del proyecto de regulación del río Tona embalse de Bucaramanga. Para garantizar el correcto funcionamiento de la presa, esta cuenta con un vertedero tipo Morning Glory, estructura de protección que permite el desalojo del exceso de agua presente en el embalse, pese a que el vertedero se encuentra en funcionamiento no se cuenta con un sistema de monitoreo y registro el cual reporte la cantidad de flujo desalojada, Por consiguiente, surge la necesidad de cuantificar el caudal que llega a evacuar el embalse en tiempo real, obtener estos datos es relevante, ya que al conocer dicho caudal se puede establecer un balance hídrico. Para ello, se realizaron campañas de aforo teniendo como objetivo generar la curva de gasto asociada al embalse, posteriormente se determinaron parámetros de: lugar, ubicación de tecnologías a implementar y presupuestos de dos soluciones de estación. Se concluye sugiriendo implementar el diseño de una estación con Limnígrafo digital, considerando su menor precio y precisión. | |
dc.description.abstractenglish | Contents World population growth brings problems to societies, exemplified on the one hand by the efficient, timely and optimal supply of public services; the solution to these problems is centered on adequate planning and projection of modern systems that guarantee the supply of resources; in this case, water provision implies correct resource management that contemplates engineering solutions for intervention in water bodies such as lagoons, reservoirs, etc. At a local level there are two entities in charge of the protection and management of water resources for Bucaramanga and its metropolitan area: the Regional Autonomous Corporation for the Defense of the Bucaramanga Plateau (CDMB), and the Metropolitan Aqueduct of Bucaramanga (AMB) S.A. E.S.P. As a mission purpose the aqueduct projects to guarantee the supply of drinking water for the next 25 years through the project of regulation of the Tona River Bucaramanga reservoir. In order to guarantee the correct operation of the dam, it has a Morning Glory spillway, a protection structure that allows the evacuation of the excess water present in the reservoir, even though the spillway is in operation, there is no monitoring and registration system that reports the amount of flow that has been evacuated. Therefore, there is a need to quantify the flow that is evacuated from the reservoir in real time, obtaining this data is relevant, since knowing this flow can establish a water balance. To this end, gauging campaigns were carried out with the aim of generating the flow curve associated with the reservoir. Subsequently, parameters were determined such as: location, location of technologies to be implemented and budgets for two station solutions. | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Ingeniero Civil | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/39946 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
dc.publisher.program | Ingeniería Civil | |
dc.publisher.school | Escuela de Ingeniería Civil | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | Vertedero De Excesos | |
dc.subject | Aforos | |
dc.subject | Curva De Gasto Y Estación De Medición. | |
dc.subject.keyword | Excess Spillway | |
dc.subject.keyword | Gauging | |
dc.subject.keyword | Flow Curve And Measuring Station | |
dc.title | Diseño de la estación para la medición del caudal del vertedero de excesos del embalse Bucaramanga | |
dc.title.english | Design of the station for the measurement of the flow of the excess landfill of the Bucaramanga reservoir* | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 127.01 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 187.18 KB
- Format:
- Adobe Portable Document Format