Estrategia para optimizar el completamiento de pozos de desarrollo en el campo de llanito, mediante el uso de unidades tipo “Rigless”
dc.contributor.advisor | Abaúnza Sepúlveda, Luis José | |
dc.contributor.author | Cristancho Diaz, Jose Alfredo | |
dc.contributor.evaluator | Montes Páez, Erik Giovany | |
dc.contributor.evaluator | Rodríguez Reyna, Diego Armando | |
dc.date.accessioned | 2022-04-14T16:56:32Z | |
dc.date.available | 2022-04-14T16:56:32Z | |
dc.date.created | 2022-03-30 | |
dc.date.issued | 2022-03-30 | |
dc.description.abstract | El tamaño de las unidades “Workover” (WO) en el completamiento de pozos afecta la operación en localizaciones con múltiples pozos. La secuencia de movimiento del taladro de perforación en estas localizaciones influye en una reducción significativa del espacio; posterior a la etapa de perforación y desmovilización del taladro, usualmente se reportan hasta 4 pozos en espera por completamiento con estas unidades de WO. Con esto, la aplicación de la unidad WO en el completamiento de pozos del campo Llanito ha planteado nuevos retos, debido a los retrasos en el cumplimiento de metas por periodo, derivados del reducido espacio disponible en las localizaciones, la exigencia en el tiempo de terminación y los costos de alquiler y de personal. En el documento se plantea y evalúa una estrategia para optimizar el completamiento de pozos mediante el uso equipos “Rigless”. La estrategia propuesta considera que, durante las fases iniciales del completamiento, el equipo de WO puede ser reemplazado con equipos “Rigless”. Estos equipos, por su menor tamaño y características técnicas, requieren de menor espacio de operación y presentan menor complejidad logística. El desarrollo de la estrategia propuesta con unidades “Rigless” es presentada, primero, con una descripción de la estrategia actual de completamiento con unidades WO y de sus requerimientos y resultados históricos de aplicación. Posteriormente, la estrategia “Rigless” es aplicada y evaluada en los pozos de una localización del campo Llanito. Según los resultados, la aplicación de la estrategia propuesta condujo a una reducción en los tiempos de puesta en producción, en comparación con la estrategia convencional. Los históricos de puesta en producción con la estrategia actual reportaron valores entre 100 y 113 días, mientras que con la aplicación de la estrategia “Rigless”, los tiempos de producción reportaron valores entre 25 y 85 días. | |
dc.description.abstractenglish | Size of workover units (WO) in well completion affects operation performances in locations with multiple wells. Sequence of movement of the drilling rig in these locations reduces available space for application of other procedures. After drilling and demobilization of drill, up to 4 wells are usually left for completion with WO units. With this, the application of the WO units for the completion of wells in Llanito field has faced new challenges, due to delays in operations and the corresponding increase in costs, derived from the reduced available space in the locations. Herein a strategy for optimizing the completion of wells by the use of Rigless equipment is proposed and evaluated in a location of the Llanito field. The proposed strategy is based in the fact that during the initial phases of completion, the WO equipment can be replaced by the Rigless equipment. Rigless equipment, due to their smaller size and technical characteristics, require less operating space and have less logistical complexity. The development of the proposed strategy with Rigless is presented, first, with a description of the current completion strategy with WO units and its requirements, as well as its historical application results. Subsequently, the Rigless strategy is applied and evaluated in the wells of a location of the Llanito field. According to the results, the application of the proposed strategy led to a reduction in production start-up times, compared to the conventional WO strategy. The production start-up records with the current strategy reported values between 100 and 113 days, while with the application of the Rigless strategy, the production times reported values for production start-up between 25 and 85 days. | |
dc.description.degreelevel | Maestría | |
dc.description.degreename | Magíster en Ingeniería de Petróleos y Gas | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/9876 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingeníerias Fisicoquímicas | |
dc.publisher.program | Maestría en Ingeniería de Petróleos y Gas | |
dc.publisher.school | Escuela de Ingeniería de Petróleos | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.subject | Completamiento de pozos | |
dc.subject | optimización | |
dc.subject | campo Llanito | |
dc.subject.keyword | Well Completion | |
dc.subject.keyword | optimization | |
dc.subject.keyword | workover | |
dc.subject.keyword | Llanito field | |
dc.subject.keyword | Rigless units | |
dc.title | Estrategia para optimizar el completamiento de pozos de desarrollo en el campo de llanito, mediante el uso de unidades tipo “Rigless” | |
dc.title.english | Strategy for Optimizing Completion of Developed Wells in Llanito Field, by the Use of Rigless Units | |
dc.type.coar | http://purl.org/coar/resource_type/c_bdcc | |
dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Maestría | |
dspace.entity.type |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 306.29 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 301.91 KB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 2.18 KB
- Format:
- Item-specific license agreed to upon submission
- Description: