Identificación de retos para la implementación de sistemas de aprovechamiento de aguas lluvias y reusó de aguas grises en predios residenciales del área metropolitana de Bucaramanga
dc.contributor.advisor | Oviedo Ocaña, Edgar Ricardo | |
dc.contributor.author | Delgado Ariza, Kamila Valentina | |
dc.contributor.author | Toloza Barrera, Julian David | |
dc.contributor.evaluator | Patiño Gutierrez, Sebastian Elias | |
dc.contributor.evaluator | Dominguez Rivera, Isabel Cristina | |
dc.date.accessioned | 2025-03-04T12:10:24Z | |
dc.date.available | 2025-03-04T12:10:24Z | |
dc.date.created | 2025-03-03 | |
dc.date.issued | 2025-03-03 | |
dc.description.abstract | La escasez del recurso hídrico es uno de los mayores desafíos globales actuales. El crecimiento poblacional, el cambio climático y la gestión inadecuada del agua han llevado a un agotamiento del recurso vital. Es urgente adoptar y desarrollar medidas para disminuir el consumo de agua potable. Es por eso que, la implementación de sistemas descentralizados para el aprovechamiento de aguas lluvias (SAALL) y reúso de aguas grises (RAG) en viviendas o edificaciones es una alternativa prometedora para hacer un uso más eficiente del agua, reduciendo la presión sobre los sistemas de abastecimiento tradicionales y promoviendo la sostenibilidad. Por ende, este estudio analiza los desafíos y oportunidades relacionados con la puesta en marcha de sistemas híbridos de AALL y RAG en viviendas y edificaciones del área metropolitana de Bucaramanga (AMB). Para tal efecto, se analizaron y compararon estudios previos realizados en el grupo de investigación en Recursos Hídricos y Saneamiento Ambiental (GPH) de la Universidad Industrial de Santander (UIS), los trabajos abarcaron la factibilidad técnica, social, financiera y ambiental de sistemas híbridos de AALL y RAG en dos viviendas y dos edificaciones del AMB. En este estudio se compararon 38 indicadores, entre esos, el consumo de agua potable en las viviendas según el estrato socioeconómico, la aceptación social al reúso, costo de inversión de los SAALL y RAG, que permitieron identificar las diferencias técnicas, sociales y de costos asociadas a la implementación de estos sistemas según el tipo de predio y contribuyeron a reconocer siete desafíos para la puesta en marcha de los mismos. Entre los retos identificados para la implementación en el AMB se encuentran la falta de estandarización de las normas técnicas, sensibilización a los usuarios, incentivos económicos, certificaciones, proyectos demostrativos, investigación y desarrollo tecnológico local, políticas y marcos regulatorios. Los resultados de esta investigación aportan conocimiento sobre la viabilidad y el potencial de los sistemas híbridos en la gestión del recurso hídrico en áreas urbanas, y ayudan a diseñar políticas públicas y programas de promoción que fomenten su implementación a mayor escala. | |
dc.description.abstractenglish | The scarcity of water resources is one of the greatest current global challenges. Population growth, climate change, and inadequate water management have led to the depletion of this vital resource. It is urgent to adopt and develop measures to reduce drinking water consumption. Thus, implementing decentralized systems for rainwater harvesting (RWH) and greywater reuse (GWR) in homes or buildings is a promising alternative to make water use more efficient, reducing pressure on traditional supply systems and promoting sustainability. Therefore, this study analyzes the challenges and opportunities related to implementing hybrid systems of RWH and GWR in homes and buildings in the metropolitan area of Bucaramanga (AMB). For this purpose, previous studies conducted by the Water Resources and Environmental Sanitation (GPH) research group at Universidad Industrial de Santander (UIS) were analyzed and compared. These studies covered the technical, social, financial, and environmental feasibility of hybrid RWH and GWR systems in two households and two buildings in the AMB. In this study, 38 indicators were compared, including drinking water consumption in homes based on socioeconomic strata, social acceptance of reuse, and investment costs of RWH and GWR systems, which helped identify technical, social, and cost differences associated with the implementation of these systems depending on the type of property, and contributed to recognizing 7 challenges for their implementation. The identified challenges for implementation in the AMB include the lack of standardization of technical regulations, user awareness, economic incentives, certifications, demonstration projects, research and local technological development, policies, and regulatory frameworks. The results of this research provide knowledge about the viability and potential of hybrid systems in water resource management in urban areas and help design public policies and promotion programs that encourage their large-scale implementation. | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Ingeniero Civil | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/45206 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingeníerias Fisicomecánicas | |
dc.publisher.program | Ingeniería Civil | |
dc.publisher.school | Escuela de Ingenieria Civil | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Atribución-NoComercial-SinDerivadas 2.5 Colombia (CC BY-NC-ND 2.5 CO) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.subject | agua lluvia | |
dc.subject | agua gris | |
dc.subject | tratamiento de aguas | |
dc.subject | reúso | |
dc.subject | viabilidad | |
dc.subject | tecnologías | |
dc.subject | sistemas | |
dc.subject | sensibilización | |
dc.subject | ahorro de agua potable | |
dc.subject | aceptación | |
dc.subject.keyword | rainwater | |
dc.subject.keyword | grey water | |
dc.subject.keyword | water treatment | |
dc.subject.keyword | reuse | |
dc.subject.keyword | feasibility | |
dc.subject.keyword | technologies | |
dc.subject.keyword | systems | |
dc.subject.keyword | awareness | |
dc.subject.keyword | saving drinking water | |
dc.subject.keyword | acceptance | |
dc.title | Identificación de retos para la implementación de sistemas de aprovechamiento de aguas lluvias y reusó de aguas grises en predios residenciales del área metropolitana de Bucaramanga | |
dc.title.english | Identification of challenges for the implementation of rainwater harvesting and gray water reuse systems in residential properties in the metropolitan area of Bucaramanga. | |
dc.type.coar | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de Autorización.pdf
- Size:
- 295.29 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 504.59 KB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 2.18 KB
- Format:
- Item-specific license agreed to upon submission
- Description: