dc.description.abstractEl gas natural es un hidrocarburo estratégico, como materia prima para la elaboración de diferentes productos o como suministro para generación de energía, ha alcanzado alto valor comercial ofreciendo numerosas ventajas a diferentes industrias. La planta de gas a estudiar, es una existente de tratamiento del gas asociado a la producción de hidrocarburos, fue ensamblada y entró en operación en el 2010 con capacidad nominal de 3,7 MMSCFD, actualmente procesa aproximadamente 2,00 MMSCFD con una recuperación de subproductos día de 53 Bls de GLP, 278 Bls de Nafta y 1,3 MMSCFD de fuel gas. Dicha planta se compone de los siguientes sistemas: sistema de acondicionamiento de gas, sistema de refrigeración, dos torres para procesamiento, sistema de refrigeración, sistema de calentamiento (glicol y fluido térmico), sistema de almacenamiento y despacho, sistema de alivio a tea y sistema de aire comprimido, unidad recuperadora de vapores y sistema de recuperación de drenajes. Se utilizó el software Promax para la simulación del proceso con las condiciones actuales de operación, determinando la energía requerida para operar según simulación y se realizó medición física del consumo energético actual en la planta, encontrando que el sistema de refrigeración con propano es el menos eficiente con consumo energético real mucho mayor al simulado. Se propusieron diferentes escenarios de simulación, encontrando como mejor opción el escenario descrito en este documento donde hay mayor recuperación de Nafta y GLP con el mismo gasto energético actual; los demás escenarios no hacen parte de este trabajo y no están incluidos en este documento. Realizando la optimización propuesta, se obtiene producción adicional del 43% de Nafta y 13% de GLP con el mismo gasto energético actual; requiere inversión inicial de USD$183.000 y se obtienen ingresos adicionales de USD$133.000 al mes, haciendo que la inversión sea pagada en 41 días
dc.description.abstractenglishThe natural gas is a strategic hydrocarbon, so much as a raw material for different products or as supply for generation of energy, has reached a high commercial value that offers numerous advantages to different industries. The gas plant that will be studied, is an existing treatment plant of gas associated with the production of hydrocarbons, it was assembled and started operating in 2010 with a nominal capacity of 3,7 MMSCFD, at present it sues 2,00 MMSCFD with a recovery per day of by-products to 53 Bls of GLP, 278 Bls of Naphtha and 1,3 MMSCFD of fuel gas. This plant is composed of the followings systems: gas conditioning system, cooling system, two processing towers, propane refrigeration system, glycol and thermal oil heating system, storage and dispatch system, tea relief system and the compressed air system, vapor recovery unit (VRU) and integrated drain recovery system. Promax software was used to perform the simulation with the current operation conditions, it was determined the energy required for operate by the simulation and performed the physical measurement of the current energy consumption, finding that propane refrigeration system is less efficient with a real energy consumption much higher than that found by simulation. Different scenarios were proposed for the simulation, finding as best option the scenario described in this document where there is highest recovery of Naphtha and LPG with the same current energy required; the other proposed scenarios are not part of this work and are not included in this document. By performing the proposed optimization, will obtain an additional production of 43% of Naphtha and 13% of LPG with the same energy required actually; An initial investment of USD$ 183,000 is necessary and additional income of USD$ 133,000 per month is obtained, causing the initial investment to be paid in 41 days.
dc.description.degreelevelEspecialización
dc.description.degreenameEspecialista en Producción de Hidrocarburos
dc.format.mimetypeapplication/pdf
dc.identifier.instnameUniversidad Industrial de Santander
dc.identifier.reponameUniversidad Industrial de Santander
dc.identifier.repourlhttps://noesis.uis.edu.co
dc.identifier.urihttps://noesis.uis.edu.co/handle/20.500.14071/37326
dc.language.isospa
dc.publisherUniversidad Industrial de Santander
dc.publisher.facultyFacultad de Ingenierías Fisicoquímicas
dc.publisher.programEspecialización en Producción de Hidrocarburos
dc.publisher.schoolEscuela de Ingeniería de Petróleos
dc.rightshttp://creativecommons.org/licenses/by/4.0/
dc.rights.accessrightsinfo:eu-repo/semantics/openAccess
dc.rights.creativecommonsAtribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0)
dc.rights.licenseAttribution-NonCommercial 4.0 International (CC BY-NC 4.0)
dc.rights.urihttp://creativecommons.org/licenses/by-nc/4.0
dc.subjectPlanta De Gas
dc.subjectEfecto Joule Thomson
dc.subjectRefrigeración Mecánica
dc.subjectDeshidratación Con Glicol
dc.subjectNafta
dc.subjectGlp
dc.subjectFuel Gas
dc.subjectConsumo Energético.
dc.subject.keywordGas Plant
dc.subject.keywordJoule Thomson Effect
dc.subject.keywordMechanical Refrigeration
dc.subject.keywordDehydration With Glycol
dc.subject.keywordNaphtha
dc.subject.keywordLpg
dc.subject.keywordFuel Gas
dc.subject.keywordEnergy Consumption.
dc.titleEstudio del estado energético actual de una planta de gas ubicada en la Cuenca de los Llanos colombianos
dc.title.englishStudy of the actual energy state of a gas plant located in la cuenca de los llanos colombianos
dc.type.coarhttp://purl.org/coar/version/c_b1a7d7d4d402bcce
dc.type.hasversionhttp://purl.org/coar/resource_type/c_7a1f
dc.type.localTesis/Trabajo de grado - Monografía - Pregrado
Files
Original bundle
Now showing 1 - 3 of 3
No Thumbnail Available
Name:
Carta de autorización.pdf
Size:
521.34 KB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Documento.pdf
Size:
4.27 MB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Nota de proyecto.pdf
Size:
1012.56 KB
Format:
Adobe Portable Document Format