dc.description.abstractLa perforación es la etapa de todo proceso de extracción de hidrocarburos en la cual se incurren con la mayor cantidad de recursos y costos operacionales. Adicionalmente, los nuevos desafíos para perforar pozos cada vez más complejos y profundos resaltan por experiencia que los principales problemas operativos se presentan por situaciones derivadas de una inadecuada implementación de las diferentes técnicas operacionales. La técnica Managed Pressure Drilling MPD surge como una alternativa para mejorar la perforación de pozos, optimizando parámetros que permiten mejorar la ROP y reducir los tiempos no productivos, entre otros; obteniendo resultados seguros y eficientes en la mayoría de los casos donde fue aplicada la misma. La correcta planeación que incluye parámetros físicos, de laboratorio y simulaciones, permiten analizar de manera clara el planteamiento de procedimientos, que especifiquen paso a paso lo que es necesario para ejecutar el plan operacional y tener resultados seguros y eficientes acorde con lo esperado y que permitan conseguir los objetivos visualizados. Realizar simulaciones basadas en Modelos y Sistemas de Fluidos que generen escenarios extremos en la búsqueda del ECD objetivo para el trabajo, permitirá definir los equipos óptimos para la aplicación de la técnica MPD. Por ende, este documento plantea diseñar un manual de buenas prácticas operacionales al implementar la metodología MPD en un campo Colombiano donde se aplicó la técnica, documentando los principales parámetros de planeación, procedimientos, ejecución y lecciones aprendidas derivadas de la ejecución del proyecto, así como información propia de la operación, que sirva como base para fortalecer el diseño de los procedimientos y ejecución de la perforación con la técnica MPD en futuros proyectos, contemplando las mejores herramientas, equipos, preparación de personal y pruebas/simulaciones derivadas de las lecciones aprendidas.
dc.description.abstractenglishThe drilling is the section of all hydrocarbon extraction process in which are incurred with the greatest amount of expenses and costs. Additionally, the main operational problems are presented by situations derived from a poor implementation of the different operational techniques. The managed pressure drilling technique emerges as an alternative to improve well drilling, optimizing parameters such as non-productive times, ROP, among others; obtaining efficient results in many of the cases where it was applied. The correct planning, which includes physical, laboratory and simulation parameters, allows to analyse in a clear way the approach of a procedure that specifies step by step what is necessary so that, when executing the operational plan, optimal results are obtained, according to what expected and with the achieved achievements. Therefore, this document proposes to design a manual of good operational practices when applying the MPD methodology in a Colombian field where it was carried out, documenting the main parameters of planning, procedures, execution and lessons learned, with evidences of the execution of the project, information specific to the operation, which serves as a basis for the preliminary design of the procedures and execution of a drilling with the MPD technique, with the best tools, equipment, personnel preparation and tests / simulations observed and analysed in the lessons learned.
dc.description.degreelevelPregrado
dc.description.degreenameIngeniero de Petróleos
dc.format.mimetypeapplication/pdf
dc.identifier.instnameUniversidad Industrial de Santander
dc.identifier.reponameUniversidad Industrial de Santander
dc.identifier.repourlhttps://noesis.uis.edu.co
dc.identifier.urihttps://noesis.uis.edu.co/handle/20.500.14071/37314
dc.language.isospa
dc.publisherUniversidad Industrial de Santander
dc.publisher.facultyFacultad de Ingenierías Fisicoquímicas
dc.publisher.programIngeniería de Petróleos
dc.publisher.schoolEscuela de Ingeniería de Petróleos
dc.rightshttp://creativecommons.org/licenses/by/4.0/
dc.rights.accessrightsinfo:eu-repo/semantics/openAccess
dc.rights.creativecommonsAtribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0)
dc.rights.licenseAttribution-NonCommercial 4.0 International (CC BY-NC 4.0)
dc.rights.urihttp://creativecommons.org/licenses/by-nc/4.0
dc.subjectMpd (Managed Pressure Drilling)
dc.subjectPerforación
dc.subjectManual De Buenas Prácticas.
dc.subject.keywordMpd (Managed Pressure Drilling)
dc.subject.keywordDrilling
dc.subject.keywordGood Practice Manual.
dc.titlePerforación con la técnica MPD (managed pressure drilling), procedimientos y buenas prácticas de operación
dc.title.englishDrilling with mpd technique (managed pressure drilling), procedures and good operating practices.
dc.type.coarhttp://purl.org/coar/version/c_b1a7d7d4d402bcce
dc.type.hasversionhttp://purl.org/coar/resource_type/c_7a1f
dc.type.localTesis/Trabajo de grado - Monografía - Pregrado
Files
Original bundle
Now showing 1 - 3 of 3
No Thumbnail Available
Name:
Carta de autorización.pdf
Size:
155.05 KB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Documento.pdf
Size:
2.45 MB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Nota de proyecto.pdf
Size:
48.36 KB
Format:
Adobe Portable Document Format