Non-productive time in tow-section well construction case study in Ecuador

No Thumbnail Available
Date
Advisors
Evaluators
Journal Title
Journal ISSN
Volume Title
Publisher
Universidad Industrial de Santander
Abstract
Description
Considering the current costs for drilling services within a market being completely unstable that have placed the oil barrel at lowest prices in the last decade, it is extremely important to reduce every activity that delay the normal course of well drilling. The proposal for a resource of planning which is obtained from the present research. This resource was developed for engineers and operators aiming at ending of wellbore within scheduled time with the stablished budget, in this way being the operation successful in every well into more quick tasks with higher return on investment by starting early the well production. The economic impact of unplanned events is exposed as a result from this paper
Con los costos actuales de los servicios de perforación y un mercado totalmente inestable que ha ubicado al precio del barril de petróleo en sus niveles más bajos en la última década; resulta imperativo minimizar cualquier evento que retrase el avance de perforación de un pozo. La propuesta de implementar una herramienta de planificación desarrollada a partir de los resultados de la investigación brindará a ingenieros y operadores un recurso que contribuirá a terminar un pozo dentro de los plazos establecidos con apego al presupuesto, culminando de manera exitosa cada pozo, con campañas de perforación cada vez más cortas y con un retorno sobre la inversión más alto al poner a producir los pozos en menor tiempo. Como resultado del trabajo se expone el impacto económico de los eventos no planificados.
Keywords
Non-productive time, Drilling problems, Drilling optimization, Tiempo no productivo, Problemas al perforar, Optimización de la perforación
Citation