Non-productive time in tow-section well construction case study in Ecuador

dc.creatorLoaiza, Marco
dc.creatorAyala, Diego
dc.creatorTorres, Henry
dc.creatorAyala, Silvia
dc.date2018-07-24
dc.date.accessioned2022-03-14T20:18:05Z
dc.date.available2022-03-14T20:18:05Z
dc.descriptionConsidering the current costs for drilling services within a market being completely unstable that have placed the oil barrel at lowest prices in the last decade, it is extremely important to reduce every activity that delay the normal course of well drilling. The proposal for a resource of planning which is obtained from the present research. This resource was developed for engineers and operators aiming at ending of wellbore within scheduled time with the stablished budget, in this way being the operation successful in every well into more quick tasks with higher return on investment by starting early the well production. The economic impact of unplanned events is exposed as a result from this paperen-US
dc.descriptionCon los costos actuales de los servicios de perforación y un mercado totalmente inestable que ha ubicado al precio del barril de petróleo en sus niveles más bajos en la última década; resulta imperativo minimizar cualquier evento que retrase el avance de perforación de un pozo. La propuesta de implementar una herramienta de planificación desarrollada a partir de los resultados de la investigación brindará a ingenieros y operadores un recurso que contribuirá a terminar un pozo dentro de los plazos establecidos con apego al presupuesto, culminando de manera exitosa cada pozo, con campañas de perforación cada vez más cortas y con un retorno sobre la inversión más alto al poner a producir los pozos en menor tiempo. Como resultado del trabajo se expone el impacto económico de los eventos no planificados.es-ES
dc.formatapplication/pdf
dc.identifierhttps://revistas.uis.edu.co/index.php/revistafuentes/article/view/8545
dc.identifier10.18273/revfue.v16n1-2018001
dc.identifier.urihttps://noesis.uis.edu.co/handle/20.500.14071/6693
dc.languagespa
dc.publisherUniversidad Industrial de Santanderes-ES
dc.relationhttps://revistas.uis.edu.co/index.php/revistafuentes/article/view/8545/8486
dc.rightsDerechos de autor 2018 Revista Fuenteses-ES
dc.rights.accessrightsinfo:eu-repo/semantics/openAccess
dc.rights.coarhttp://purl.org/coar/access_right/c_abf2
dc.rights.creativecommonsAtribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0)
dc.rights.licenseAttribution-NonCommercial 4.0 International (CC BY-NC 4.0)
dc.sourceRevista Fuentes, el reventón energético; Vol. 16 Núm. 1 (2018): Fuentes, el reventón energético; 7-17es-ES
dc.sourceFuentes, el reventón energético; Vol. 16 No. 1 (2018): Fuentes, el reventón energético; 7-17en-US
dc.sourceREVISTA FUENTES; v. 16 n. 1 (2018): Fuentes, el reventón energético; 7-17pt-BR
dc.source2145-8502
dc.source1657-6527
dc.subjectNon-productive timeen-US
dc.subjectDrilling problemsen-US
dc.subjectDrilling optimizationen-US
dc.subjectTiempo no productivoes-ES
dc.subjectProblemas al perforares-ES
dc.subjectOptimización de la perforaciónes-ES
dc.titleNon-productive time in tow-section well construction case study in Ecuadoren-US
dc.titleTiempo no productivo en pozos de dos secciones, caso de estudio Ecuadores-ES
dc.typeinfo:eu-repo/semantics/article
dc.typeinfo:eu-repo/semantics/publishedVersion
dspace.entity.type
Files