Evaluación técnica de la modernización de la planta de gas del campo Payoa a través del reemplazo del intercambiador de calor gas-gas
dc.contributor.advisor | Peña Velásquez, Hermes | |
dc.contributor.author | Rueda Rangel, Mario Eduardo | |
dc.contributor.evaluator | Ariza León, Emiliano | |
dc.date.accessioned | 2022-09-19T13:37:44Z | |
dc.date.available | 2022-09-19T13:37:44Z | |
dc.date.created | 2022-09-07 | |
dc.date.issued | 2022-09-07 | |
dc.description.abstract | La Planta del Gas del campo Payoa comenzó a operar en el año 1965 bajo el contrato de Asociación “Carare Las Monas” suscrito entre Ecopetrol S.A. y PetroSantander GMBH. Con el paso de los años el volumen de extracción de las fracciones pesadas de hidrocarburos presentes en el Gas Rico, que alimenta el proceso de la Planta de Gas del campo Payoa, ha venido disminuyendo y la calidad de los productos tales como Gas Residual, Propano, Butano y Gasolina se han visto afectadas. La razón de esta disminución de volumen y afectación en la calidad es que varios de los equipos principales de la planta presentan baja eficiencia, fugas o deterioro por tantos años de uso. Durante el desarrollo de la presente Monografía se realizó una descripción del proceso actual de la Planta de Gas del campo Payoa. Se utilizó el software de proceso Aspen Hysys para simular el desempeño actual de la Planta ajustándolo con los datos reales de campo y también se simuló el impacto que tendría el reemplazo de uno de los equipos principales del proceso, conocido como Intercambiador de Calor Gas – Gas, en los volúmenes de extracción de las fracciones pesadas del Gas Rico y en la calidad del Gas Residual. Finalmente, se realizó un dimensionamiento del Intercambiador de Calor nuevo que mejor se adaptaría al proceso de la Planta de Gas del campo Payoa. Las conclusiones principales de la evaluación después de instalar y poner en operación un nuevo Intercambiador de Calor en la Planta de Gas del campo Payoa son: • La extracción de las fracciones pesadas tendría un incremento de 37% en volumen. • La relación entre los líquidos recuperados y el gas procesado (GPM) incrementaría de 2.07 a 2.85. • El porcentaje molar de las fracciones pesadas presentes en la corriente de gas residual disminuiría de 4.89% a 3.85%. • La instalación de un nuevo Intercambiador Gas-Gas es altamente benéfica para el proceso de la Planta de Gas. | |
dc.description.abstractenglish | The Payoa Gas Planta started operation in 1965 under the Association Contract “Carare-Las Monas” executed between Ecopetrol S.A. y PetroSantander GMBH. Through the years, the extraction of the heavy fraction of Hydrocarbons presents in the Rich Gas that goes into the Gas Plant process has decreased. Also, the quality of the products such as Dry Gas, Propane, Butane and Gasoline has been affected. The decrease in extraction and quality affection is because some of the main equipment in the Gas Plant have leaks, low efficiency and wear due to several years of operation. During the development of the present study a general description of the current Gas Plant process was done. By using Hysys the actual performance of the Payoa Gas Plant was simulated and compared against field data for adjustment. Then, a simulation installing a new Gas-Gas Heater was performed to evaluate the impact of it, in the recovered volume of the heavy hydrocarbons fraction and the Dry Gas quality. Finally, a design of the new Gas-Gas Heater that better fits the needs of the Gas Plan was done. The main conclusions of the evaluation after installing and putting in operation a new Gas-Gas Heater in the Payoa Gas Plant are: • The extraction of the heavy hydrocarbons fraction would increase by 37% in volume. • The relationship between extracted liquids and the gas that is processed in the gas plant (GPM) will increase from 2.07 to 2.85. • The molar percentage of the heavy fraction present in the Residual Gas Stream will decrease from 4.89% to 3.85%. • The installation of a new Gas-Gas Heater is highly recommended to improve the Payoa Gas Plant Process. | |
dc.description.degreelevel | Especialización | |
dc.description.degreename | Especialista en Ingeniería del Gas | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Facultad de Ingenierías Fisicoquímicas | |
dc.identifier.reponame | Escuela de Ingeniería de Petróleos | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/11535 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingeníerias Fisicoquímicas | |
dc.publisher.program | Especialización en Ingeniería del Gas | |
dc.publisher.school | Escuela de Ingeniería de Petróleos | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.subject | Intercambiador de Calor Gas – Gas | |
dc.subject | Planta de Gas | |
dc.subject.keyword | Gas-Gas Heater | |
dc.subject.keyword | Gas Plant | |
dc.title | Evaluación técnica de la modernización de la planta de gas del campo Payoa a través del reemplazo del intercambiador de calor gas-gas | |
dc.title.english | Technical Evaluation of the Payoa Gas Plant upgrade by the Replacement of the Gas-Gas Heater | |
dc.type.coar | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Especialización | |
dspace.entity.type |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 258.71 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 107.59 KB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 2.18 KB
- Format:
- Item-specific license agreed to upon submission
- Description: