Estimacion del precio de la accion de la empresa construcciones el condor
dc.contributor.advisor | Duarte Duarte, Juan Benjamin | |
dc.contributor.author | Quintero Valbuena, Cristian Alexander | |
dc.date.accessioned | 2023-04-06T20:10:59Z | |
dc.date.available | 2023 | |
dc.date.available | 2023-04-06T20:10:59Z | |
dc.date.created | 2019 | |
dc.date.issued | 2019 | |
dc.description.abstract | Esta valoración se realizó basada en la información pública, tomando datos específicamente de la página web de la Superintendencia Financiera por medio del RNVE Registro Nacional De Valores Y Emisores, para no tener sesgos y dar una valoración imparcial. Inicialmente se realizó diagnóstico del entorno y del sector de infraestructura, después se realizó un diagnostico financiero de los últimos 5 años desde 2013 a 2017, con esta información se analizaron los indicadores de endeudamiento, liquidez, solvencia, rentabilidad y rotación. Se valoró por múltiplos financieros RPG, PER, Precio sobre ventas, P/VL, Dividend Yield y EV/Ebitda, y la valoración por el método de flujo de caja libre descontando FCLD esta con el fin de valorarla a diciembre de 2017, la valoración se realizó considerando la empresa Se plantearon 4 escenarios variando el valor de continuidad 1er escenario el optimista en donde se tuvo en cuenta el gradiente de crecimiento, 2º. Escenario moderado donde no se tuvo en cuenta el gradiente de crecimiento, 3er. Escenario moderado convergente en donde se asume que no hay inversión neta 4º. Escenario moderado con reinversión en donde se asume que el crecimiento es la inflación f, en todos los escenarios se realizó una análisis probabilístico con la herramienta @risk en donde se ajustaron todas las variables desde el principio para hallar su media y su desviación estándar. Reflejando en cada contexto la probabilidad de que el precio de la acción estuviera por encima de mil pesos que es el precio que estuvo la acción a diciembre de 2018. * | |
dc.description.abstractenglish | This assessment was made based on public information, taking data specifically from the website of the Financial Superintendence through the RNVE National Registry of Securities and Issuers, so as not to have biases and give an unbiased assessment. Initially a diagnosis was made of the environment and the infrastructure sector, after which a financial diagnosis was made of the last 5 years from 2013 to 2017, with this information the indebtedness, liquidity, solvency, profitability and rotation indicators were analyzed. It was valued by financial multiples RPG, PER, Price on sales, P/VL, Dividend Yield and EV/Ebitda, and the valuation by the free cash flow method discounting FCLD this in order to value it as of December 2017, the valuation was made considering the company "as it is" where the same structure of the balance sheet and the income statement of the last 5 years were assumed. 4 scenarios were proposed varying the continuity value, 1st scenario the optimist where the growth gradient was taken into account, 2nd. Moderate scenario where the growth gradient was not taken into account, 3rd Moderate convergent scenario where it is assumed that there is no net investment 4th Moderate scenario with reinvestment where it is assumed that growth is inflation f, In all scenarios, a probabilistic analysis was performed with the @risk tool, where all the variables were adjusted from the beginning to find their mean and standard deviation. Reflecting in each context the probability that the price of the stock was above one thousand Colombian pesos, which is the price that the stock was at December 2018. * | |
dc.description.degreelevel | Maestría | |
dc.description.degreename | Magíster en Gerencia de Negocios | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/13944 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
dc.publisher.program | Maestría en Gerencia de Negocios - MBA | |
dc.publisher.school | Escuela de Estudios Industriales y Empresariales | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.subject | Valoración | |
dc.subject | Análisis Probabilístico | |
dc.subject | Flujo De Caja L | |
dc.subject.keyword | Valuation | |
dc.subject.keyword | Probabilistic Analysis | |
dc.subject.keyword | Discounted Free Cash Flow | |
dc.subject.keyword | Financial Multiples | |
dc.subject.keyword | "As It Is". | |
dc.title | Estimacion del precio de la accion de la empresa construcciones el condor | |
dc.title.english | Estimation of the action price for the company construcciones el condor* | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_bdcc | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Maestría | |
dspace.entity.type |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 260.57 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 193.58 KB
- Format:
- Adobe Portable Document Format