Diseño de un sistema de bombeo para la extracción de agua subterránea autosostenible implementando la energía de un sistema eólico en la ranchería “El Horno”, Riohacha, La Guajira

dc.contributor.advisorRueda Ordóñez, Yesid Javier
dc.contributor.authorCadena Ribón, Eilyn Dayana
dc.contributor.authorSegura Barrera, Brayan Andrés
dc.contributor.evaluatorMartínez, Manuel del Jesús
dc.contributor.evaluatorQuiroga Méndez, Jabid Eduardo
dc.date.accessioned2022-04-06T18:04:39Z
dc.date.available2022-04-06T18:04:39Z
dc.date.created2022-03-29
dc.date.issued2022-03-29
dc.description.abstractEl objetivo de este proyecto es el diseño de un sistema de bombeo para la extracción de agua alimentado mediante la energía eólica para suplir las necesidades de la ranchería “El Horno”, La Guajira; para tal fin se llevó a cabo el estudio de las condiciones del entorno y los recursos disponibles de la comunidad, es decir, la cantidad de agua potable que requieren diariamente, las fuentes de agua cercanas y, por último, la cantidad de recurso eólico. Después de esto, se estimaron los parámetros de bombeo, con lo cual se seleccionan los componentes óptimos para el sistema, teniendo en cuenta el caudal, las pérdidas que se pueden presentar y la facilidad de adaptación del sistema de energía alternativa. Para el cálculo de la red de distribución, se optó por un sistema alimentado por una bomba. Para ello se consideró un caudal constante para todas las casas. De esta manera, variando el caudal de bombeo, observando la potencia requerida para suministrar al fluido, el tiempo requerido para toda la operación y las pérdidas de carga, se analizaron bombas existentes en el mercado y considerando los resultados de las condiciones obtenidas, se seleccionó una bomba que cumpliera con los requisitos y tuviera un menor consumo energético. Seguidamente, teniendo en cuenta la potencia solicitada por el sistema de bombeo, se realizó el cálculo de los parámetros necesarios para la elección de los componentes del sistema eólico. Se consideraron tiempos de operación del sistema de bombeo, medios de almacenamiento energético, puesto que se plantea utilizar la energía generada durante un día. Se seleccionaron demás elementos y se modeló el sistema de tal manera que se aprecia la distribución en un espacio y el detallado de los componentes mediante planos. Finalmente, se presentan las conclusiones del proceso de diseño del sistema.
dc.description.abstractenglishThe objective of this project is the design of a pumping system for the extraction of water fed by wind energy to meet the needs of the rancheria "El Horno", La Guajira; for this purpose, the study of the conditions of the environment and the available resources of the community was carried out, that is, the amount of drinking water they require daily, the nearby water sources and, finally, the amount of wind resource. After this, the pumping parameters were estimated, with which the optimal components for the system are selected, considering the flow, the losses that may occur and the ease of adaptation of the alternative energy system. For the calculation of the distribution network, a system powered by a pump was chosen. For this, a constant flow was considered for all the houses. In this way, varying the pumping flow, observing the power required to supply the fluid, the time required for the entire operation and the load losses, existing pumps on the market were analyzed and considering the results of the conditions obtained, a pump that met the requirements and had a lower energy consumption was selected. Then, considering the power requested by the pumping system, the calculation of the parameters necessary for the choice of the components of the wind system was carried out. Operating times of the pumping system, energy storage media, were considered, since it is proposed to use the energy generated during a day. Other elements were selected, and the system was modeled in such a way that the distribution in a space and the detailing of the components through planes are appreciated. Finally, the conclusions of the system design process are presented.
dc.description.degreelevelPregrado
dc.description.degreenameIngeniero Mecánico
dc.format.mimetypeapplication/pdf
dc.identifier.instnameUniversidad Industrial de Santander
dc.identifier.reponameUniversidad Industrial de Santander
dc.identifier.repourlhttps://noesis.uis.edu.co
dc.identifier.urihttps://noesis.uis.edu.co/handle/20.500.14071/9726
dc.language.isospa
dc.publisherUniversidad Industrial de Santander
dc.publisher.facultyFacultad de Ingeníerias Fisicomecánicas
dc.publisher.programIngeniería Mecánica
dc.publisher.schoolEscuela de Ingeniería Mecánica
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rights.accessrightsinfo:eu-repo/semantics/openAccess
dc.rights.coarhttp://purl.org/coar/access_right/c_abf2
dc.rights.creativecommonsAtribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0)
dc.rights.licenseAttribution-NonCommercial 4.0 International (CC BY-NC 4.0)
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/
dc.subjectSistema de bombeo
dc.subjectEnergía eólica
dc.subjectAerogenerador
dc.subjectBomba centrífuga
dc.subject.keywordPumping system
dc.subject.keywordWind energy
dc.subject.keywordWind turbine
dc.subject.keywordCentrifugal pump
dc.titleDiseño de un sistema de bombeo para la extracción de agua subterránea autosostenible implementando la energía de un sistema eólico en la ranchería “El Horno”, Riohacha, La Guajira
dc.title.englishDesign of a pumping system for the extraction of self-sustaining groundwater implementing the energy of a wind system in the rancheria "El Horno", Riohacha, La Guajira
dc.type.coarhttp://purl.org/coar/resource_type/c_7a1f
dc.type.hasversionhttp://purl.org/coar/version/c_b1a7d7d4d402bcce
dc.type.localTesis/Trabajo de grado - Monografía - Pregrado
dspace.entity.type
Files
Original bundle
Now showing 1 - 3 of 3
Loading...
Thumbnail Image
Name:
Documento.pdf
Size:
12.31 MB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Carta de autorización.pdf
Size:
169.13 KB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Nota de proyecto.pdf
Size:
225.08 KB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
2.18 KB
Format:
Item-specific license agreed to upon submission
Description: