Optimización de la producción del Campo Provincia (pozos Santos, Conde, Suerte y Sabana), como resultado del análisis nodal pozo a pozo y la revisión del sistema de levantamiento

dc.contributor.advisorCalvete González, Fernando Enrique
dc.contributor.authorRincón Pardo, Rocío Del Pilar
dc.contributor.authorPaez Crespo, William Alberto
dc.date.accessioned2024-03-03T18:42:21Z
dc.date.available2011
dc.date.available2024-03-03T18:42:21Z
dc.date.created2011
dc.date.issued2011
dc.description.abstractLas condiciones actuales de operación del Sistema de GAS-LIFT del Campo Provincia se evidencia la necesidad de introducir modificaciones en el tipo de GAS-LIFT o cambio a otro Sistema de levantamiento artificial; se analizaron 41 pozos (registros de gradiente dinámico de presión y temperatura). Para cada pozo se determinó la presión fluyente al punto medio de las perforaciones, considerando la profundidad del punto de inyección, con este valor se estimó la capacidad actual de aporte de fluidos del área de drenaje del pozo para finalmente aplicar la técnica del Análisis Nodal y obtener la curva de rendimiento del pozo de gas-LIFT. Con la información anterior y aplicando los criterios respectivos se establece si el pozo necesita: cambio de sistema artificial de producción, rediseño o ajuste de sistema de GAS-LIFT (sub o sobre-inyección) o sencillamente dejar el pozo como está. Basado en estos resultados se puede establecer las ventajas para proceder a un cambio del sistema artificial de producción en los pozos candidatos. La razón fundamental es que el GAS-LIFT continuo posee limitaciones en cuanto a la reducción de la presión de fondo fluyente y por ende reducción en la efectividad en pozos de baja presión estática. Con bombas reciprocantes se podría aumentar sustancialmente el diferencial (drawdown); asumiendo una PIP de 100 psig con la bomba frente al punto medio de las perforaciones el aumento global de producción esperada con las recomendaciones sugeridas (incluyendo rediseños, ajuste de gas etc.) está en el orden de los 1250 bpd con liberación de capacidad de compresión en el orden de los 7 MMscf/d. Según la evaluación económica realizada para un pozo, se estableció la viabilidad de realizar una prueba piloto para cambio de sistema a Bombeo Mecánico, debido a que se obtiene un ganancial del 66% comparado con la producción del pozo con GAS-LIFT.
dc.description.abstractenglishThe current condition of the Gas Lift Systems in the Provincia`s Field needs modifications or changes for another lift system, the condition was to find after the results of the 41 Well analyses (Logs of dynamic pressure gradient and temperature). For each well (one by one) the flowing pressure was determined at the midpoint of the perforations, considering the depth of the injection point, this value is estimated the current capacity of fluid of the drainage area of the well and finally apply the Nodal Analysis technique and obtain the yield curve of GAS-LIFT well. With the above information and applying the respective criteria it will demonstrate if the well requires: changing artificial production system, redesign or adjustment of GAS-LIFT system (under-or up flow injection point) or simply leave the well as it is. Based on these results we can establish the advantages to proceed with a change of the artificial system of production in the candidate wells. The principal point of the GAS-LIFT is the continued limitations on the reduction of flowing bottom hole pressure and hence reduced effectiveness in low static pressure wells. With reciprocating pumps could substantially increase the differential (drawdown), assuming a PIP of 100 psig with the pump from the midpoint of the perforations, the overall production increase expected with the suggested recommendations (including redesigns, gas adjustment etc.) are in the order of 1250 bpd with release of compression capability in the order of 7 MMscf / d. About the economical analysis for the one well, was establish the options for the pilot test for a change of the mechanical pump systems obtains a 66% better than of the gas lift well.
dc.description.degreelevelEspecialización
dc.description.degreenameEspecialista en Producción de Hidrocarburos
dc.format.mimetypeapplication/pdf
dc.identifier.instnameUniversidad Industrial de Santander
dc.identifier.reponameUniversidad Industrial de Santander
dc.identifier.repourlhttps://noesis.uis.edu.co
dc.identifier.urihttps://noesis.uis.edu.co/handle/20.500.14071/25484
dc.language.isospa
dc.publisherUniversidad Industrial de Santander
dc.publisher.facultyFacultad de Ingenierías Fisicoquímicas
dc.publisher.programEspecialización en Producción de Hidrocarburos
dc.publisher.schoolEscuela de Ingeniería de Petróleos
dc.rightshttp://creativecommons.org/licenses/by/4.0/
dc.rights.accessrightsinfo:eu-repo/semantics/openAccess
dc.rights.creativecommonsAtribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0)
dc.rights.licenseAttribution-NonCommercial 4.0 International (CC BY-NC 4.0)
dc.rights.urihttp://creativecommons.org/licenses/by-nc/4.0
dc.subjectGas-Lift
dc.subjectLevantamiento Artificial
dc.subjectEvaluación Económica
dc.subject.keywordGas-Lift
dc.subject.keywordLift Artificial Economic Assessment
dc.titleOptimización de la producción del Campo Provincia (pozos Santos, Conde, Suerte y Sabana), como resultado del análisis nodal pozo a pozo y la revisión del sistema de levantamiento
dc.title.englishOptimization of the provincia`s field production (well`s: santos, conde, suerte & sabana) about the results from nodal analysis well to well and the review of the artificial lift systems actually used. keywords: gas-lift, lift artificial economic assessment
dc.type.coarhttp://purl.org/coar/version/c_b1a7d7d4d402bcce
dc.type.hasversionhttp://purl.org/coar/resource_type/c_7a1f
dc.type.localTesis/Trabajo de grado - Monografía - Pregrado
Files
Original bundle
Now showing 1 - 3 of 3
No Thumbnail Available
Name:
Carta de autorización.pdf
Size:
212.7 KB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Documento.pdf
Size:
2.19 MB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Nota de proyecto.pdf
Size:
57.72 KB
Format:
Adobe Portable Document Format