Publicación: Desarrollo de una estrategia contractual de exploración y producción (e&p) para los campos menores de Ecopetrol S.A., basada en el modelo mexicano de laboratorios integrales de campos (lic)
| dc.contributor.advisor | Gutiérrez Pulido, Rogelio | |
| dc.contributor.author | Chamorro Galvis, Juan Carlos | |
| dc.date.accessioned | 2024-03-03T22:00:39Z | |
| dc.date.available | 2015 | |
| dc.date.available | 2024-03-03T22:00:39Z | |
| dc.date.created | 2015 | |
| dc.date.issued | 2015 | |
| dc.description.abstract | Ecopetrol ha venido aplicando diferentes modelos contractuales de exploración y explotación, tales como los Contratos de Asociación, Contratos de Colaboración Empresarial, Contratos de Servicio de Producción Bajo Riesgo (SPBR), Contratos de Producción con Riesgo para Campos Descubiertos No Desarrollados e Inactivos (CDNDI), Contratos de Producción Incremental (CPI), Contratos de Operación y Mantenimiento Integral (O&M), Acuerdos de Operación Conjunta (JOA), Licencia, entre otros, mediante los cuales, a través de un socio ha tratado de maximizar su producción y las reservas de hidrocarburos, pero estos no satisfacen las exigencias actuales de los mercados y la explotación de los Yacimientos No Convencionales, de gran complejidad tecnológica. Ante las exigencias actuales, el no contar con grandes descubrimientos y tener la mayoría de los yacimientos convencionales bastante explotados, agotados y maduros, es necesario contar con un modelo contractual que apalanque los pilotos tecnológicos en los Yacimientos No Convencionales, tener actividad de exploración y explotación en áreas con bajo potencial convencional, que asegure la retención de áreas, que permita reducir costos, utilizar tecnologías de última generación, mantener el 100% de los recursos no convencionales como propiedad de Ecopetrol, no ceder reservas y desarrollar un modelo de negocio acorde a las características de estos campos, es que se analiza la adaptación en Ecopetrol del Modelo Mexicano de Laboratorios Integrales de Campos, como una posible solución para suplir estas falencias. La aplicación del modelo LIC podría hacer parte de las actuales estrategias de Ecopetrol, sin embargo, en la actualidad, con el comportamiento en el mercado del precio del petróleo, el cual se posiciona en unos niveles bajos y con el nuevo plan de transformación 2015-2030, necesario para asegurar la sostenibilidad de la Compañía, se debe entrar a evaluar la conveniencia de la aplicación de este modelo, desde una perspectiva de rentabilidad y generación de valor. | |
| dc.description.abstractenglish | Ecopetrol has been applying different contractual models for exploration and exploitation, such as Association Agreements (CA), Joint Venture Agreements, Contracts Low Risk Production Service (SPBR), Production Contracts Threatening Fields Discovered Undeveloped and Inactive (CDNDI) , Incremental Production Contracts (CPI), Operating and Integral Maintenance (O&M), Joint Operation Agreements (JOA), License, among others, by which, through a partner has tried to maximize its production and reserves hydrocarbons, but these do not meet current market requirements and exploitation of deposits Unconventional, high technological complexity. Given the current requirements, the failure to have great discoveries and most have pretty overexploited, depleted and mature conventional reservoirs, it is necessary to have a contractual model that leverages the technological drivers in Unconventional Reservoirs, have exploration and development activity in areas with low conventional potential, to ensure retention areas, to would reduce costs, using latest technologies, keep 100% of non-conventional resources as the property of Ecopetrol, do not give reserves and develop a business model according to the characteristics of these areas, is that adaptation is analyzed in Ecopetrol Mexican Model Field Integrated Laboratory (FIL), as a possible solution to meet these shortcomings. Applying the FIL model could be part of the current strategies of Ecopetrol, but today, with the market behavior of oil prices, which is positioned at low levels and the new transformation plan 2015 2030, needed to ensure the sustainability of the Company, should enter assess the appropriateness of the application of this model, from the perspective of profitability and value creation. | |
| dc.description.degreelevel | Maestría | |
| dc.description.degreename | Magíster en Gerencia de Negocios | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/32176 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
| dc.publisher.program | Maestría en Gerencia de Negocios - MBA | |
| dc.publisher.school | Escuela de Estudios Industriales y Empresariales | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Lic | |
| dc.subject | Yacimientos No Convencionales | |
| dc.subject | Modelo Negocio | |
| dc.subject | Reducción | |
| dc.subject | Costos. | |
| dc.subject.keyword | Fil | |
| dc.subject.keyword | Unconventional Reservoir | |
| dc.subject.keyword | Business | |
| dc.subject.keyword | Model | |
| dc.subject.keyword | Reduction | |
| dc.subject.keyword | Costs. | |
| dc.title | Desarrollo de una estrategia contractual de exploración y producción (e&p) para los campos menores de Ecopetrol S.A., basada en el modelo mexicano de laboratorios integrales de campos (lic) | |
| dc.title.english | Development of a contract strategy exploration and production (e & p) for the fields under Ecopetrol S.A., mexican model field integrated laboratory (fil) based. | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_bdcc | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Maestria | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 315.34 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 115.57 KB
- Formato:
- Adobe Portable Document Format
