Publicación: Asistencia técnico-administrativa para el cumplimiento del sistema de control de calidad en obra en los proyectos conjunto residencial Arawak y casa de don David de Urbanas S.A.
| dc.contributor.advisor | Toro Rodriguez, Wilfredo del | |
| dc.contributor.author | Mendoza Rodríguez, Carlos Andrés | |
| dc.contributor.author | Garcia Mendoza, Juan Pablo | |
| dc.date.accessioned | 2024-03-03T17:00:41Z | |
| dc.date.available | 2008 | |
| dc.date.available | 2024-03-03T17:00:41Z | |
| dc.date.created | 2008 | |
| dc.date.issued | 2008 | |
| dc.description.abstract | En esta práctica el objetivo principal es ejercer un control de calidad que es requerido durante la obra, a manera mas especifica, se tiene que realizar un seguimiento a las diferentes actividades con tal de garantizar un producto que cumpla con todos los requisitos de calidad. Este seguimiento y control es ejecutado mediante la realización de pruebas y ensayos específicos para dichas actividades, por ejemplo, para el proceso de estructura se llevaron a cabo pruebas de asentamiento del concreto, pruebas de resistencia a la compresión, ensayo de esclerometría y pruebas de resistencia a la tensión de aceros; para la actividad de mampostería y pañetes, se realizo la prueba a la resistencia a la compresión en unidades de mampostería no estructural; para el proceso de instalaciones hidráulica, sanitaria y de gas se efectuaron pruebas de presión hidráulica, estanqueidad y de hermeticidad respectivamente para garantizar el optimo desempeño de dichas instalaciones. Se realizo un análisis especial en el tema del concreto utilizado en obra, ya que es uno de los materiales o recursos más críticos debido a que define el normal desarrollo de la obra. El concreto es pedido en obra con especificaciones diferentes, para verificar los valores de resistencia esperados se efectúa pruebas de resistencia a la compresión para diferentes edades. Muchas veces se presenta en obra problemas con la resistencia a la compresión, por lo tanto se realizo un análisis estadístico para comprobar y saber con el valor de resistencia a los 3 días, el valor aproximado que tendremos de resistencia a los 28 días, este resultado es basado en graficas de tendencia, en porcentajes de avances de resistencia que arrojan los datos de resistencia presentada en obra. Sumado a esto se realizo una hoja de calculó que abarca los principales ensayos requeridos para el control de calidad en obra | |
| dc.description.abstractenglish | In this practice the main objective is to exercise a quality control that is required during the works, a more specific way, you have to keep track of the different activities in order to ensure a product that meets all quality requirements. This monitoring and control is executed by conducting specific tests and tests for such activities, for example, for the process of structure were carried out tests of the concrete settlement, evidence of resistance to compression and testing of tensile strength of steel; for the activity of masonry and pañetes, the test was performed to the compressive strength in units of non- structural masonry; for the process of hydropower facilities, health and gas tests were conducted hydraulic pressure, tightness and tightness respectively to ensure the optimum performance of such facilities. It was made a special analysis on the issue of the concrete used in work because it is one of the most critical materials or resources because it defines the normal development of the work. The concrete is called into work with different specifications, to verify the values of expected resistance are made tests of resistance to compression for different ages. Many times is presented in Works problems with the compressive strength, hence was performed a statistical analysis to see and know with the value of resistance to 3 days, the approximate value we will have resistance at 28 days, this result is based on graphs of trend, as a percentage of advances in resistance that the data show of resistance presented at work. Added to this was made a spreadsheet which covers major required tests for quality control at work. . | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero Civil | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/20720 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
| dc.publisher.program | Ingeniería Civil | |
| dc.publisher.school | Escuela de Ingeniería Civil | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Control de Calidad | |
| dc.subject | Análisis Estadístico | |
| dc.subject | Concreto. | |
| dc.subject.keyword | Quality Control | |
| dc.subject.keyword | Statistical Analysis | |
| dc.subject.keyword | Concrete. | |
| dc.title | Asistencia técnico-administrativa para el cumplimiento del sistema de control de calidad en obra en los proyectos conjunto residencial Arawak y casa de don David de Urbanas S.A. | |
| dc.title.english | Technical assistance administrative for the implementation of the system of quality control in work in the projects set residential arawak and casa de don david 2 of urbanas sa*. | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 358.93 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 392.13 KB
- Formato:
- Adobe Portable Document Format
