Publicación: Mejoramiento de las operaciones de preparación en la tercera línea de extracción de Cedsa S.A.
| dc.contributor.advisor | Nino Lopez, Myriam Leonor | |
| dc.contributor.author | Reyes Uscategui, Luis Felipe | |
| dc.date.accessioned | 2024-03-03T17:02:38Z | |
| dc.date.available | 2008 | |
| dc.date.available | 2024-03-03T17:02:38Z | |
| dc.date.created | 2008 | |
| dc.date.issued | 2008 | |
| dc.description.abstract | Diseño e implementación de un método de trabajo eficiente para la operación de preparación en el proceso de la tercera línea de extrusión de CEDSA S.A., reduciendo los tiempos involucrados con el alistamiento de cada uno de los equipos que componen este puesto de trabajo. Para lograr el objetivo principal de este trabajo, inicialmente se describió la situación actual con el método empleado en la preparación de los equipos de la línea y la realización de un estudio de tiempos registrando los procedimientos en videos posteriormente analizados. Una vez se definió el patrón inicial de comparación, equipo por equipo, elemento por elemento los procedimientos empleados en la preparación fueron analizados, identificando cuales de ellos se cumplían mientras el proceso productivo se llevaba a cabo, y cuales mientras éste se detenía. De forma simultánea se identificaron las primeras propuestas de externalización. Con el análisis detallado finalizado, se procedió a concretar las propuestas de mejora planteadas, cuantificando los beneficios en términos del tiempo reducido y los costos involucrados para llevarlas ante el tomador de decisiones y lograr su aprobación. Una a una las propuestas autorizadas por la Gerencia de Producción, o en su defecto, la Gerencia General, fueron implementadas y de manera simultanea los operarios le la línea en sus tres turnos fueron sometidos a un programa de capacitación en el cambio de los procedimientos. Finalizando el trabajo se llevó a cabo nuevamente un estudio de tiempos sobre la preparación de los equipos después de implementadas las mejoras, con el fin de determinar su efecto y obtener los estándares requeridos para distribuir equitativamente el trabajo entre los dos operarios de la línea, obteniendo realmente un método de trabajo eficiente | |
| dc.description.abstractenglish | Design and implementation of an efficient work method for the setup operations on the third extrusion line process of CEDSA S.A., reducing times involucrate with the preparation of each one of the machines that compound this process step. In order to achieve the principal goal of this work, the initial situation was described with the method used on every setup procedure, which were also recorded to be subject of a time study. Once the initial standard was established, machine by machine, element by element the procedures used on the setup operations were analyzed, identifying which one of those were executed while production was in progress and which others not. Simultaneously the first improvement proposals were identified. With the detailed analysis finished, the next step was concretizing the improvement proposals raised, quantifying their benefits on terms of times reduced and costs included for being exposed to the decision taker. One by one the proposes authorized by the Production Management, or in its absence, the General Management, were implemented and at the same time the extrusion™s line operators were subjected to a training program for the procedures changes. Finishing this work a new time study was applied again over the resultants procedures after the improvements, trying to identify its effects and also to obtain the standards required to distribute equitably the work charge between both of the operators | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero Industrial | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/21002 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
| dc.publisher.program | Ingeniería Industrial | |
| dc.publisher.school | Escuela de Estudios Industriales y Empresariales | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Preparación | |
| dc.subject | SMED (Cambio de dado en menos de 10 minutos) | |
| dc.subject | Línea de Extrusión | |
| dc.subject | Elemento (unidad de un procedimiento). | |
| dc.subject.keyword | Setup | |
| dc.subject.keyword | SMED (Single Minute Die Exchange) | |
| dc.subject.keyword | Extrusion Line | |
| dc.subject.keyword | Element (procedure unit or step). | |
| dc.title | Mejoramiento de las operaciones de preparación en la tercera línea de extracción de Cedsa S.A. | |
| dc.title.english | Improvement of the setup operations on third extrusion line of cedsa s.a.* | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
