Publicación: Revisión y rediseño de las instalaciones eléctricas del establecimiento penitenciario de mediana seguridad de San Gil
| dc.contributor.advisor | Jurado Jerez, Ciro | |
| dc.contributor.author | Ramírez Rojas, Álvaro Enrique | |
| dc.contributor.author | Rodriguez Navas, Eda Constanza | |
| dc.contributor.author | Parra Sequeda, Elkin Libardo | |
| dc.contributor.author | Ramirez Medina, Ricardo | |
| dc.date.accessioned | 2024-03-03T18:05:32Z | |
| dc.date.available | 2010 | |
| dc.date.available | 2024-03-03T18:05:32Z | |
| dc.date.created | 2010 | |
| dc.date.issued | 2010 | |
| dc.description.abstract | Por medio de este estudio se busca realizar un diagnostico del estado actual de las instalaciones eléctricas del Establecimiento Penitenciario de Mediana Seguridad de San Gil, para así proponer soluciones a los problemas existentes mediante la elaboración de un rediseño total de las instalaciones eléctricas del lugar. En la realización de este proyecto se llevó a cabo una serie de actividades para que el rediseño de las instalaciones eléctricas del Establecimiento Penitenciario de Mediana Seguridad de San Gil sea el más adecuado, confiable y seguro cumpliendo normatividades y reglamentaciones. Para ello fueron requeridas cuatro etapas: Recopilación y Obtención de Datos (1), Elaboración del Levantamiento Eléctrico del Lugar (2), Rediseño de las Instalaciones Eléctricas (3), Elaboración del Presupuesto Total del Rediseño Propuesto (4). Se realizó una revisión completa de las instalaciones eléctricas existentes en el Establecimiento Penitenciario, que permitió conocer sus condiciones actuales; a partir de esto se llevó a cabo la elaboración del levantamiento total de las redes eléctricas del lugar. Se monitoreó el comportamiento de la carga en la subestación y en diferentes puntos del Establecimiento con el fin de conocer el estado de la red; se realizaron las mediciones de los respectivos niveles de iluminación en los diferentes puestos de trabajo y demás locaciones; se realizaron cálculos de regulación en acometida y en los diferentes circuitos ramales. Finalmente se presenta el rediseño con sus planos eléctricos, junto con un documento en el cual se consigna toda la información referente a los cálculos de los niveles de iluminación, niveles de regulación de tensión, cuadros de carga, sistemas de puesta a tierra y demás memorias de cálculo necesarias de acuerdo con las normas técnicas Colombianas y las vigentes para el departamento de Santander, así como las reglamentaciones establecidas RETIE y RETILAP, agregado a esto se presenta el respectivo análisis presupuestal total del rediseño, teniendo en cuenta los costos actuales del mercado. | |
| dc.description.abstractenglish | This study seeks to diagnose the current state of the electrical wiring at the medium security penitentiary at San Gil, and propose solution to the existing problems by the complete redesign of the electrical wiring of the location. During the development of this Project several activities were performed to redesign the electrical wiring from the medium security penitentiary and allow it to be adequate, trustworthy and safe complying all the appropriate regulations and standers. To accomplish this, four stages were developed (1) Data acquisition and recompilation. (2) Electrical lift up of the facilities. (3) Electrical wiring redesign. (4) Performance of the total budget for the proposed redesign. A complete review of the electrical wiring of the penitentiary was performed in order to establish its current conditions. After the review, a complete electrical lift up was performed. The behavior of the charge at the substation, as well as other locations, was monitored in order to diagnose the state of the network. The light levels were measured on several work stations and other locations and the appropriate calculations were performed. The redesign is presented with its electrical prints, along with a document which includes the information related to the light level calculations, energy regulation levels, charge tables, ground systems and the calculations required by the technical standards from Colombia and the current standers from the department (Santander). Other regulations considered are the RETIE and RETILAP. Along with the above mentioned, the total budget analysis for the redesign is presented considering the current costs of the market. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero Electricista | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/23407 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
| dc.publisher.program | Ingeniería Eléctrica | |
| dc.publisher.school | Escuela de Ingenierías Eléctrica, Electrónica y Telecomunicaciones | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Instalaciones eléctricas | |
| dc.subject | Revisión | |
| dc.subject | Estudio | |
| dc.subject | Levantamiento | |
| dc.subject | Rediseño | |
| dc.subject | análisis | |
| dc.subject | presupuesto. | |
| dc.subject.keyword | Electrical wiring | |
| dc.subject.keyword | Revision | |
| dc.subject.keyword | Study | |
| dc.subject.keyword | Lift up | |
| dc.subject.keyword | Redesign | |
| dc.subject.keyword | analysis | |
| dc.subject.keyword | budget. | |
| dc.title | Revisión y rediseño de las instalaciones eléctricas del establecimiento penitenciario de mediana seguridad de San Gil | |
| dc.title.english | Revision and redesign of the electrical wiring at the medium security penitentiary from san gil. | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 2.65 MB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Documento.pdf
- Tamaño:
- 11.26 MB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 3.2 MB
- Formato:
- Adobe Portable Document Format
