Publicación: Estudios y diseños a nivel de fase III del corredor vial Aguaclara-Guarumito, departamento de Norte de Santander
| dc.contributor.advisor | Castaneda Pinzon, Eduardo Alberto | |
| dc.contributor.author | Ariza Fontecha, Jesús Alberto | |
| dc.date.accessioned | 2024-03-03T17:37:18Z | |
| dc.date.available | 2009 | |
| dc.date.available | 2024-03-03T17:37:18Z | |
| dc.date.created | 2009 | |
| dc.date.issued | 2009 | |
| dc.description.abstract | El presente documento está basado en la Práctica Empresarial desarrollada en los Estudios y Diseños a nivel Fase III, mediante un convenio entre la Universidad Industrial de Santander y el Instituto Nacional de Vías (INVIAS). El documento presenta las características de los servicios que la Universidad presta por medio de las Políticas de Extensión, siendo la Consultoría el servicio mediante el cual, la Universidad desarrolla los estudios; además se hace una descripción general del proyecto, junto con las diferentes actividades y políticas de calidad que se siguieron durante todo el proceso, esto con el fin de cumplir con los requerimientos establecidos. Durante la práctica se desarrollaron varia funciones, entre las que se destacan el de Ingeniero Auxiliar en la parte de Tránsito, Capacidad y Niveles de Servicio y el seguimiento del proyecto. Como Auxiliar de ingeniería se debían hacer trabajos de campo y de oficina, los cuales estaban supervisados por el Especialista y el Director General del proyecto, cuyos resultados se presentan en los Anexos del documento. El aporte se describe como una guía que servirá para próximos estudios, que plantea una metodología y junto con el informe final de los estudios de tránsito Capacidad y Niveles de Servicio (Anexo A), permitirán desarrollar las actividades necesarias para cumplir con los requerimientos planteados al inicio del proyecto. La guía tendrá como fin facilitar el desarrollo de los estudios por parte del Auxiliar de Ingeniería al presentar los resultados de acuerdo a los parámetros establecidos en el archivo final. | |
| dc.description.abstractenglish | This document is based on the Business Practice developed in Studies and Designs of Phase III level, through an agreement between the Universidad Industrial de Santander and the National Roads Institute (INVIAS). The paper presents the characteristics of the services provided through the University Policy Outreach, with the Consulting service through which the University develops the studies, also provides an overview of the project, together with the different activities and quality policies that were followed throughout the process, this in order to comply with the requirements established. During the practice were developed several functions, among which feature the Assistant Engineer in the Transit issues, Capacity and Service Levels and project monitoring. As Engineering Assistant is needed to do field work and office, which were supervised by the Specialist and the Director General of the project, whose results are presented in the Annexes to the document. The contribution is described as a guide that will help future studies, which poses a methodology along with the final report of the Capacity Transit Study and Levels of Service (Attachment A), will provide the necessary activities to meet with the requirements established at the beginning of the project. The guide will aim to facilitate the development of the study by the Engineering Assistant presenting the results according to the established parameters in the final file. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero Civil | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/22830 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
| dc.publisher.program | Ingeniería Civil | |
| dc.publisher.school | Escuela de Ingeniería Civil | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Servicios De Extensión Tránsito | |
| dc.subject | Capacidad Y Niveles De Servicio Cronograma De Actividades | |
| dc.subject.keyword | Extension Services Traffic | |
| dc.subject.keyword | Capacity And Service Levels Schedule Of Activities | |
| dc.title | Estudios y diseños a nivel de fase III del corredor vial Aguaclara-Guarumito, departamento de Norte de Santander | |
| dc.title.english | Studies and designs on phase iii level in aguaclara - guarumito road corridor, department of norte de santander | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 225.44 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 949.65 KB
- Formato:
- Adobe Portable Document Format