Publicación: Diseño e implementación de un sistema de mejoramiento de los procesos productivos, basado en el estudio del trabajo para Calzado Adonay
| dc.contributor.advisor | Hernandez Sanchez, Xiomara | |
| dc.contributor.author | Cáceres Rincón, Oscar José | |
| dc.date.accessioned | 2024-03-03T16:31:40Z | |
| dc.date.available | 2007 | |
| dc.date.available | 2024-03-03T16:31:40Z | |
| dc.date.created | 2007 | |
| dc.date.issued | 2007 | |
| dc.description.abstract | El presente documento tiene como finalidad evidenciar las mejoras implementadas en Calzado Adonay logradas durante el desarrollo de la práctica empresarial; este proyecto se realizó como respuesta a las necesidades de la empresa en aras de lograr altos niveles de eficiencia operativa de su planta de producción, preparándose para los retos que propone el ámbito de competencia global en el cual la industria del calzado se encuentra inmersa. El objetivo del proyecto es diseñar e implementar un sistema de mejoramiento de los procesos productivos basado en el estudio del trabajo mediante el análisis de la aplicación de la estrategia de 5 S´s, despilfarros, inventarios, estudio de métodos y tiempos, planeación de la producción e indicadores de gestión con el fin de mejorar la productividad de Calzado Adonay, para lo cual se implementó la estrategia de 5 S´s, se estudiaron los despilfarros mediante el análisis 5MQS, se implementaron un sistema de inventarios un programa de producción y un sistema de indicadores basados en los requerimientos de información de la organización. Como resultado de la práctica se mejoraron las condiciones de trabajo y el desempeño de los empleados debido al aseo y orden de los puestos de trabajo, se obtuvo una reducción de inventarios disminuyendo sus costos asociados y generando mayores ganancias. Se aumento la capacidad de la planta al reducir el tiempo de producción en el área de soladura donde se encontró el recurso restrictivo de capacidad. Se obtuvo un mayor control de la producción mediante el programa de producción propuesto el cual estandariza las actividades de producción semanales, se realizaron capacitaciones que aumentaron el conocimiento de los trabajadores en los temas de producción y mejoraron el clima organizacional. Se instaló un sistema de indicadores que permitirá a la organización tomar acciones derivadas del análisis estadístico del comportamiento de los mismos. | |
| dc.description.abstractenglish | The present document has as purpose to evidence the improvements implemented in Calzado Adonay and achieved during the development of the empresarial practice; this project was carried out as answer to the necessities of the company for the sake of achieving high levels of operative efficiency of its production plant, getting ready for the challenges that the global competition environment of proposes in which the industry of the footwear is inmersed. The objective of the project is to design and to implement a system of improvement of the productive processes based on the study of the work by means of the analysis of the application of the 5 S´s strategy, wastefulness, inventories, methods and times study, planning of the production and management indicators with the purpose of improving the productivity of Calzado Adonay, for that which the 5 S´s strategy was established, the wastefulness were studied by means of the 5MQS analysis, an inventory system was implemented and also a production program and a system of indicators based on the information requirements of the organization. As a result of the practice the work conditions and the performance of the employees were improved due to the cleanliness and the order of the work positions, a reduction of inventories was obtained diminishing its associate costs and generating bigger earnings. The plant capacity was increased by reducing the production time in the soladura area where the restrictive resource of capacity was found. A bigger control of the production was obtained by means of the proposed production program which standardizes the weekly production activities, trainings were carried out that increased the knowledge of the workers in the production topics and they improved the organizational climate. A system of indicators was settled that will allow to the organization to take derived actions of the statistical analysis of the behavior of the same ones. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero Industrial | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/19620 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
| dc.publisher.program | Ingeniería Industrial | |
| dc.publisher.school | Escuela de Estudios Industriales y Empresariales | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Producción | |
| dc.subject | Análisis de despilfarros | |
| dc.subject | Estrategia de 5 S´s | |
| dc.subject | Sistema de inventarios | |
| dc.subject | Programa de producción | |
| dc.subject | calzado. | |
| dc.subject.keyword | Production | |
| dc.subject.keyword | Analysis of wastefulness | |
| dc.subject.keyword | 5 S´s strategy | |
| dc.subject.keyword | Inventory system | |
| dc.subject.keyword | Production program | |
| dc.subject.keyword | footwear. | |
| dc.title | Diseño e implementación de un sistema de mejoramiento de los procesos productivos, basado en el estudio del trabajo para Calzado Adonay | |
| dc.title.english | Design and implementation of a system of improvement of the productive processes based in the study of work for calzado adonay". * | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
