Publicación: Plan de mantenimiento centrado en confiabilidad (rcm) para el sistema eléctrico de baja tensión que suministra energía a los pozos productores a la superintendencia de operaciones de Mares - gerencia general del Magdalena Medio - Ecopetrol S.A.
| dc.contributor.advisor | Pinzón Ortega, Robinson | |
| dc.contributor.author | Romero Gómez, Angelica Patricia | |
| dc.contributor.author | Jolianis Navarro, Liliana Astrid | |
| dc.date.accessioned | 2024-03-03T18:47:24Z | |
| dc.date.available | 2011 | |
| dc.date.available | 2024-03-03T18:47:24Z | |
| dc.date.created | 2011 | |
| dc.date.issued | 2011 | |
| dc.description.abstract | Este proyecto se realizó como respuesta a la necesidad de la Unidad de Mantenimiento Electrico de Campo de la Superintendencia de Operaciones de Mares (SOM) de reducir la diferida de producción de crudo que le es atribuida anualmente para mejorar los indicadores de gestión y optimizar los recursos asignados. El área de Mantenimiento Eléctrico de Campo es, dentro del Departamento de Mantenimiento de la SOM, la encarga de garantizar la funcionalidad de los equipos que conforman el sistema eléctrico de los pozos productores de la superintendencia, las fallas asociadas a este sistema han aportado la mayor diferida de crudo atribuida al Departamento de Mantenimiento en los dos últimos años debido a su recurrencia e impacto, por esta razón se generó la necesidad de plantear y desarrollar una estrategia de mantenimiento bajo la filosofía de Mantenimiento Centrado en la Confiabilidad (RCM). Un paso fundamental en el desarrollo del proyecto fue la identificación de los modos y efectos de las fallas y sus consecuencias, luego se estableció la forma adecuada de gestionarlos, si cada una de las fallas era merecedora de prevención, de esfuerzos para predecirla, algún tipo de intervención periódica para evitarla, rediseño para eliminarla, o simplemente ninguna acción. Para efectuar todo este proceso de manera estructurada se aplicó el árbol lógico de decisiones del RCM de Jhon Mourbray propuesto en su libro de RCM II. De esta forma se determinó cuáles eran las tareas adecuadas y su frecuencia y se elaboró el programa de mantenimiento para los activos. En el análisis de los modos de falla y sus efectos se involucró al personal del área eléctrica: supervisores y técnicos de mantenimiento, y personal de operaciones, aprovechando la experiencia que todos poseen acerca del sistema. | |
| dc.description.abstractenglish | This project was done in response to the need of the Electrical Maintenance Unit Mares Operations Superintendent (SOM) to reduce the deferred production of crude oil that annually is attributed to them in order to improve performance indicators and optimize resources. Electrical Maintenance is the area within the Maintenance Department of the SOM, that handles of ensuring the functionality of the equipment that are part of the electrical system of the producing wells of the superintendence, the failures associated with this system have provided the largest deferred production attributed to maintenance department in the last two years because of its recurrence and impact, for this reason was generated the need to establish a and develop a maintenance strategy under the philosophy of Reliability Centered Maintenance (RCM). A fundamental step in the project was to identify modes and effects of failures and their consequences, then set the appropriate way to manage if each of them was worthy of prevention, efforts to predict, some periodic intervention to prevent them, redesign to eliminate them, or just any action. To make this process in a structured manner was applied the RCM logical decision tree of John Mourbray proposed in his book RCM II. Thus it was determined the appropriate tasks and their frequency and developed the maintenance program for the assets. In the analysis of failure modes and their effects was involved the electric field staff: supervisors and maintenance technicians, and operations personnel, using the experience they all have about the system. | |
| dc.description.degreelevel | Especialización | |
| dc.description.degreename | Especialista en Gerencia de Mantenimiento | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/26023 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
| dc.publisher.program | Especialización en Gerencia de Mantenimiento | |
| dc.publisher.school | Escuela de Ingeniería Mecánica | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Sistema eléctrico | |
| dc.subject | Diferida de producción | |
| dc.subject | Disponibilidad | |
| dc.subject | RCM | |
| dc.subject | Modos de fallo | |
| dc.subject | tareas de mantenimiento. | |
| dc.subject.keyword | Electrical system | |
| dc.subject.keyword | Deferred production | |
| dc.subject.keyword | Availability | |
| dc.subject.keyword | RCM | |
| dc.subject.keyword | Failure modes | |
| dc.subject.keyword | maintenance tasks. | |
| dc.title | Plan de mantenimiento centrado en confiabilidad (rcm) para el sistema eléctrico de baja tensión que suministra energía a los pozos productores a la superintendencia de operaciones de Mares - gerencia general del Magdalena Medio - Ecopetrol S.A. | |
| dc.title.english | Reliability centered maintenance plan (rcm) for low-voltage electrical system that provides power to producing wells belonging to the mares operations superintendence - magdalena medio regional management - ecopetrol s.a. | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 556.86 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 373.02 KB
- Formato:
- Adobe Portable Document Format