Publicación: Análisis del impacto de la modernización del sistema de alumbrado público en Bogotá DC. Aspectos técnicos, económicos y ambientales
| dc.contributor.advisor | Ordonez Plata, Gabriel | |
| dc.contributor.author | Rueda Chaparro, Marco Aurelio | |
| dc.date.accessioned | 2024-03-03T16:12:10Z | |
| dc.date.available | 2006 | |
| dc.date.available | 2024-03-03T16:12:10Z | |
| dc.date.created | 2006 | |
| dc.date.issued | 2006 | |
| dc.description.abstract | El proceso de modernización consiste en la actualización tecnológica cambiando las luminarias de vapor de mercurio a luminarias con vapor de sodio a alta presión. El análisis de los distintos aspectos técnicos, económicos y ambientales de la modernización del S.A.P muestran lo siguiente: Técnicamente la modernización del S.A.P implica un mejoramiento de la eficiencia del sistema, puesto que las bombillas con vapor de sodio son, por lo menos, un 40% más eficientes que las de vapor de mercurio; se usan luminarias cuyos diseños, permiten un mejor aprovechamiento de luz producida mejorando la calidad del alumbrado público y se mejoran los niveles de iluminación de las vías; también se reducen los requerimientos de mantenimiento, puesto que los nuevos diseños traen incorporado un sistema de autolimpieza del conjunto óptico exterior y se mejora la hermeticidad y la protección mecánica de las luminarias. Desde la perspectiva económica, la modernización del S.A.P implica una inversión inicial para la ejecución de las obras y una reducción de los costos del servicio de alumbrado público, pues se estima que una vez se modernice el parque lumínico de la ciudad es posible ahorrar año a año la suma de diez mil setecientos doce millones de pesos ($10 712 000 000). Ambientalmente la modernización contribuye al desarrollo sostenible de la capital, presentando implicaciones en varios sentidos: primero, una reducción del consumo energético, lo cual se traduce en uso racional de la energía. Segundo, evita el uso de agentes altamente contaminantes como el mercurio. Tercero, disminuye indirectamente la emisión de gases de efecto invernadero a la atmósfera. | |
| dc.description.abstractenglish | The modernization process consists on the technological bring up to date changing the stars of vapour of mercury to stars with vapour of sodium to high pressure. The analysis of the different technical, economic and environmental aspects of the modernization of the S.A.P shows the following thing: Technically the modernization of the S.A.P implies an improvement of the efficiency of the system, since the bulbs with vapour of sodium are, at least, a 40% more efficient that those of vapour of mercury; stars are used whose designs, allow a better use of produced light improving the quality of the public illumination and they improve the levels of illumination of the roads; they also decrease the maintenance requirements, since the new designs bring incorporate a system of auto-cleaning of the external optic group and its improves the staunchness and the mechanical protection of the stars. From the economic perspective, the modernization of the S.A.P implies an initial investment for the execution of the works and a reduction of the costs of the service of illumination public, because it is considered that once the light park of the city is modernized it is possible to save year to year the sum of ten a thousand seven hundred twelve million pesos ($10.712.000.000ºº). Environmentally the modernization contributes to the sustainable development of the capital, presenting implications in several senses: first, a reduction of the energy consumption, that which is translated in rational use of the energy. Second, it avoids the use of highly polluting agents as the mercury. Third, diminish the emission of gases of effect hothouse indirectly to the atmosphere. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero Electricista | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/18990 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
| dc.publisher.program | Ingeniería Eléctrica | |
| dc.publisher.school | Escuela de Ingenierías Eléctrica, Electrónica y Telecomunicaciones | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Alumbrado público | |
| dc.subject | Modernización alumbrado publicó. | |
| dc.subject.keyword | Illumination public | |
| dc.subject.keyword | Modernization lit | |
| dc.title | Análisis del impacto de la modernización del sistema de alumbrado público en Bogotá DC. Aspectos técnicos, económicos y ambientales | |
| dc.title.english | Analysis of the modernization of the system of illumination public (s.a.p) of bogotá; technical, economic and environmental aspects | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
