Publicación: Propuesta para integrar el sistema de aire acondicionado del edificio de administración ii, al sistema de monitoreo del centro de control del Centic
| dc.contributor.advisor | Amaya Palacio, Jose Alejandro | |
| dc.contributor.author | Pinto Leguizamón, Edgar Fabian | |
| dc.date.accessioned | 2024-03-03T18:42:50Z | |
| dc.date.available | 2011 | |
| dc.date.available | 2024-03-03T18:42:50Z | |
| dc.date.created | 2011 | |
| dc.date.issued | 2011 | |
| dc.description.abstract | El presente informe contiene toda la fundamentación teórica del estudio de factibilidad realizado, para la implementación de la integración del sistema de aire acondicionado del edificio de administración II con la plataforma de control y monitoreo Metasys en el centro de control del edificio CENTIC. Con apoyo de la división de mantenimiento de la UIS y la empresa Proyectos y Servicios Ltda. La elaboración de esta propuesta consta de tres partes, la primera parte consta de una descripción de los fundamentos teóricos en los cuales está basado este proyecto, se describió el principio básico de los sistemas de aire acondicionado Multi-v, el principio básico de los nuevos sistemas inverter, sus características y las ventajas que trae su implementación, se hablo de los protocolos presentes en la integración, en especial del protocolo para administración de edificios BMS, y el protocolo BACNet el cual es el utilizado por la plataforma de control que se encuentra en el CENTIC. La segunda parte presenta una descripción de la infraestructura existente en el campus universitario, tanto de los dispositivos como de la red LAN, realizando una descripción de sus características y sus especificaciones técnicas. También se refiere a la plataforma de control Metasys sus características de funcionamiento y su interfaz grafica. Logrando así establecer los criterios que se tendrán en cuenta para la aplicación en el diseño del sistema. Finalmente en la tercera parte de realiza el estudio de factibilidad, con el cual se sustentara la aplicación de la integración. El cual se basa en el estudio de la parte técnica, la parte operativa y la parte financiera, la cual va acompañada con la propuesta financiera presentada por Proyectos y Servicios Ltda. | |
| dc.description.abstractenglish | This report contains all the theoretical foundation of the feasibility study for the implementation of the integration of air conditioning system of the administration building II with and monitoring platform in the center Metasys building management CENTIC. With the support of the maintenance division of UIS and the company Projects and Services Ltda. The development of this proposal consists of three parts, the first part is a description of the theoretical foundations on which this project is based, described the basic principle of air conditioning system Multi-v, the basic principle of the new inverter system, their characteristics and the advantages it brings its implementation, will talk about the protocols present in integration. Especially the protocol for BMS building management and the BACNet protocol which is used by the control platform that is in CENTIC. The second part presents an overview of the existing infrastructure on campus, both of the devices on your LAN, by a description of their characteristics and technical specifications. It also refers to the platform Metasys control their operating characteristics and its graphical interface. Achieving and establishing the criteria to be taken into account when implementing the system design. Finally, the third part of the feasibility study done, which is supported with the implementation of integration. This is based on the study of the technical side, the operational and financial side, which is accompanied with the financial proposal submitted by Projects and Services Ltd. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero Electrónico | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/25529 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
| dc.publisher.program | Ingeniería Electrónica | |
| dc.publisher.school | Escuela de Ingenierías Eléctrica, Electrónica y Telecomunicaciones | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Sistemas Multi-V | |
| dc.subject | Inverter | |
| dc.subject | Bacnet | |
| dc.subject | Ads | |
| dc.subject | Metasys. | |
| dc.subject.keyword | System Multi-V | |
| dc.subject.keyword | System Inverter | |
| dc.subject.keyword | Bacnet | |
| dc.subject.keyword | Metasys | |
| dc.subject.keyword | Proposal. | |
| dc.title | Propuesta para integrar el sistema de aire acondicionado del edificio de administración ii, al sistema de monitoreo del centro de control del Centic | |
| dc.title.english | Proposal to integrate the air conditioning system administration building ii, the monitoring system control center centic. | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 498.79 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 456.09 KB
- Formato:
- Adobe Portable Document Format
