Publicación: Diseño e implementación de un programa de mantenimiento productivo total en el Canal TRO
| dc.contributor.advisor | Garavito Hernandez, Edwin Alberto | |
| dc.contributor.author | Rojas Triana, Jaime Giovanny | |
| dc.date.accessioned | 2024-03-04T00:43:51Z | |
| dc.date.available | 2020 | |
| dc.date.available | 2024-03-04T00:43:51Z | |
| dc.date.created | 2020 | |
| dc.date.issued | 2020 | |
| dc.description.abstract | El canal TRO tiene como fin la emisión de contenidos audiovisuales para educar, informar y entretener. Aportando al desarrollo cultural y socioeconómico de la región. Asimismo, a la prestación del servicio de televisión mediante: una administración, operación, producción, realización, programación y emisión de un canal regional educativo y cultural. El cual conduce a la difusión del conocimiento científico, académico, filosófico, artístico y al fortalecimiento de la identidad cultural El presente proyecto fue desarrollado bajo la modalidad de práctica empresarial, el cual tuvo como objetivo principal, el diseño e implementación de un programa de mantenimiento productivo para prever fallas y mantener la vida útil de los activos operacionales del canal TRO .Ya que, se identificó que las causa, falta de mantenimiento, implicaría averías ,tiempos muertos, defectos por deterioro de equipos y pérdida de capacidad productiva en el canal .Lo que nos lleva a la necesidad de desarrollar este plan de mantenimiento. Este documento inicia con el planteamiento del problema para lo cual se hace un diagnóstico inicial a la empresa, se basa en un marco de antecedentes y otro teórico con la información bibliográfica revisada ,posteriormente se diseñan los resultados esperados en la propuesta del programa de mantenimiento para el área técnica del canal TRO con la respectiva actualización del procedimiento MGT01, por lo cual se diseñó un manual de usuario y técnico, como también se hizo una caracterización del procedimiento de mantenimiento de los equipos más críticos y el plan de mantenimiento preventivo y correctivo, para el cumplimiento de los objetivos. También se realiza una adecuada programación del cronograma del plan de capacitaciones que busca involucrar al personal en nuevas prácticas de gestión de eficiencia del proceso misional. Y se finaliza con la estructura de la ficha técnica de indicadores enfocada en la gestión de calidad y evaluación del proceso. | |
| dc.description.abstractenglish | Canal TRO aims to telecast content to educate, inform and entertain. Contributing in this way, to the cultural and socioeconomic development of the region. Likewise, to the provision of the television service, through: administration, operation, production, realization, programming and broadcasting of a regional educational and cultural channel. Which leads to the dissemination of scientific, academic, philosophical, artistic knowledge and the strengthening of cultural identity. The present project was developed from the business practice modality, whose main objective was the design and implementation of a productive maintenance program to anticipate failures and maintain the useful life of the operational assets of Canal TRO. Because, it was identified that the cause, lack of maintenance, would imply breakdowns, dead times, defects due to equipment deterioration and loss of productive capacity in the canal. Which leads us to the need to develop this maintenance plan. This document begins with the problem statement, therefore, an initial diagnosis is made to the company, based on a background framework and a theoretical one with the bibliographic information reviewed. Subsequently, the expected results are designed in the proposal of the maintenance program for the technical area of Canal TRO, with the respective update of procedure MGT01. Consequently, a user and technical manual was designed, as well as a characterization of the maintenance procedure for the most critical equipment and the preventive and corrective maintenance plan, for complying with the objectives. On the other hand, a suitable programming of the timeline and training plans are carried out, which seeks to involve the staff in new efficiency management practices of the mission process. And it ends with the structure of the technical sheet of indicators, focused on quality management and process evaluation. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero Industrial | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/40181 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
| dc.publisher.program | Ingeniería Industrial | |
| dc.publisher.school | Escuela de Estudios Industriales y Empresariales | |
| dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
| dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
| dc.subject | Mantenimiento | |
| dc.subject | Correctivo | |
| dc.subject | Preventivo | |
| dc.subject | Área técnica | |
| dc.subject | Equipos | |
| dc.subject | emisión | |
| dc.subject | estudio | |
| dc.subject | master de producción. | |
| dc.subject.keyword | maintenance | |
| dc.subject.keyword | Corrective | |
| dc.subject.keyword | Pre-emptive | |
| dc.subject.keyword | Technical area | |
| dc.subject.keyword | Equipment | |
| dc.subject.keyword | telecast | |
| dc.subject.keyword | studio | |
| dc.subject.keyword | Master production. | |
| dc.title | Diseño e implementación de un programa de mantenimiento productivo total en el Canal TRO | |
| dc.title.english | Model and implementation of a total productive maintenance program in canal tro*. | |
| dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 307.14 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 18.66 KB
- Formato:
- Adobe Portable Document Format
