Publicación: Mejora del proceso de producción de la inyectora de plástico Welltec 190 SE II mediante el análisis de fallas potenciales y el desarrollo de un plan de mantenimiento que aumente el indicador de disponibilidad
| dc.contributor.advisor | Cuervo Velásquez, Paula Andrea | |
| dc.contributor.author | Molina Peña, Joseph David | |
| dc.contributor.evaluator | Perez Ruiz, Jose David | |
| dc.contributor.evaluator | Pinto Hernandez, William | |
| dc.date.accessioned | 2026-11-03T13:37:24Z | |
| dc.date.issued | 2026-11-03 | |
| dc.description.abstract | Este proyecto desarrolla un plan de mantenimiento preventivo para la inyectora Welltec 190 SE II de Metalcort Ingeniería S.A.S., empresa del sector metalmecánico cuyo activo crítico de producción es dicha máquina, mediante la metodología de Mantenimiento Centrado en Confiabilidad (RCM), conforme a los estándares SAE JA1011 y SAE JA1012. Para esto, se construyó primero la taxonomía jerárquica de la inyectora bajo la norma ISO 14224, codificando 40 componentes en sus respectivos sistemas hidráulico, eléctrico, de control electrónico, de refrigeración, entre otros. A partir de esta taxonomía y del historial de fallas correctivas registrado por IMOCOM entre 2019 y 2025, se elaboró una Matriz de Análisis de Modos, Efectos y Criticidad de Fallas (FMECA), identificando 69 modos de falla y calculando su Número de Prioridad de Riesgo (NPR); el 36 % de los modos superó el umbral crítico establecido, concentrados principalmente en los sistemas hidráulico y de refrigeración. Con esta información se aplicó la lógica de decisión RCM, clasificando cada modo según sus consecuencias de seguridad, ambientales, operacionales o no operacionales, y seleccionando la política de mantenimiento técnicamente viable y rentable para cada uno; de ahí resultaron 63 tareas proactivas y 6 tareas descartadas. Estas tareas se organizaron en rutas de mantenimiento por frecuencia y responsable, se documentaron en hojas de trabajo estandarizadas por sistema, y se vincularon a un inventario de 42 repuestos y consumibles clasificados bajo el criterio VED, del cual el 55 % se catalogó como vital. Adicionalmente, se calculó la disponibilidad operativa de la inyectora sobre una base semanal (93,18 %), como indicador para la planificación del programa de mantenimiento frente a la demanda de producción, que puede presentarse en cualquier momento. Con este trabajo se logró construir un proceso RCM riguroso y trazable a partir de información escasa, dejando además una herramienta de gestión de mantenimiento que puede replicarse en otros activos de la empresa. | |
| dc.description.abstractenglish | This project develops a preventive maintenance plan for the Welltec 190 SE II injection molding machine at Metalcort Ingeniería S.A.S., a company in the metal-mechanic sector whose critical production asset is this machine, using the Reliability-Centered Maintenance (RCM) methodology, in accordance with the SAE JA1011 and SAE JA1012 standards. To do this, the machine's hierarchical taxonomy was built first under the ISO 14224 standard, coding 40 components within their respective systems (hydraulic, electrical, electronic control, cooling, among others). Based on this taxonomy and on the corrective-failure history recorded by IMOCOM between 2019 and 2025, a Failure Mode, Effects and Criticality Analysis (FMECA) matrix was developed, identifying 69 failure modes and calculating their Risk Priority Number (RPN); 36% of the modes exceeded the established critical threshold, concentrated mainly in the hydraulic and cooling systems. With this information, the RCM decision logic was applied, classifying each failure mode according to its consequences (safety, environmental, operational or non-operational) and selecting the technically feasible and cost-effective maintenance policy for each one; this resulted in 63 proactive tasks and 6 discarded tasks. These tasks were organized into maintenance routes by frequency and responsible party, documented in standardized work sheets by system, and linked to an inventory of 42 spare parts and consumables classified under the VED criterion, of which 55% were rated as vital. Additionally, the machine's operational availability was calculated on a weekly basis (93.18%), as an indicator for planning the maintenance program against production demand, which can arise at any time. This work made it possible to build a rigorous and traceable RCM process from scarce information, leaving in addition a maintenance management tool that can be replicated for other assets of the company. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero Mecánico | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/48481 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingeníerias Fisicomecánicas | |
| dc.publisher.program | Ingeniería Mecánica | |
| dc.publisher.school | Escuela de Ingeniería Mecánica | |
| dc.rights | info:eu-repo/semantics/openAccess | |
| dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
| dc.rights.license | Atribución-NoComercial-SinDerivadas 2.5 Colombia (CC BY-NC-ND 2.5 CO) | |
| dc.rights.uri | https://creativecommons.org/licenses/by-nc-nd/4.0/ | |
| dc.subject | Mantenimiento centrado en confiabilidad (RCM) | |
| dc.subject | FMECA | |
| dc.subject | disponibilidad operativa | |
| dc.subject | plan de mantenimiento preventivo | |
| dc.subject | inyección de plásticos | |
| dc.subject.keyword | Reliability-centered maintenance (RCM) | |
| dc.subject.keyword | FMECA | |
| dc.subject.keyword | operational availability | |
| dc.subject.keyword | preventive maintenance plan | |
| dc.subject.keyword | plastic injection molding | |
| dc.title | Mejora del proceso de producción de la inyectora de plástico Welltec 190 SE II mediante el análisis de fallas potenciales y el desarrollo de un plan de mantenimiento que aumente el indicador de disponibilidad | |
| dc.type.coar | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication | |
| local.degreee.modality | Práctica Empresarial |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 91.51 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de proyecto.pdf
- Tamaño:
- 104.19 KB
- Formato:
- Adobe Portable Document Format
Bloque de licencias
1 - 1 de 1
Cargando...
- Nombre:
- license.txt
- Tamaño:
- 2.17 KB
- Formato:
- Item-specific license agreed to upon submission
- Descripción:
