Mejora del proceso de producción de la inyectora de plástico Welltec 190 SE II mediante el análisis de fallas potenciales y el desarrollo de un plan de mantenimiento que aumente el indicador de disponibilidad

dc.contributor.advisorCuervo Velásquez, Paula Andrea
dc.contributor.authorMolina Peña, Joseph David
dc.contributor.evaluatorPerez Ruiz, Jose David
dc.contributor.evaluatorPinto Hernandez, William
dc.date.accessioned2026-11-03T13:37:24Z
dc.date.issued2026-11-03
dc.description.abstractEste proyecto desarrolla un plan de mantenimiento preventivo para la inyectora Welltec 190 SE II de Metalcort Ingeniería S.A.S., empresa del sector metalmecánico cuyo activo crítico de producción es dicha máquina, mediante la metodología de Mantenimiento Centrado en Confiabilidad (RCM), conforme a los estándares SAE JA1011 y SAE JA1012. Para esto, se construyó primero la taxonomía jerárquica de la inyectora bajo la norma ISO 14224, codificando 40 componentes en sus respectivos sistemas hidráulico, eléctrico, de control electrónico, de refrigeración, entre otros. A partir de esta taxonomía y del historial de fallas correctivas registrado por IMOCOM entre 2019 y 2025, se elaboró una Matriz de Análisis de Modos, Efectos y Criticidad de Fallas (FMECA), identificando 69 modos de falla y calculando su Número de Prioridad de Riesgo (NPR); el 36 % de los modos superó el umbral crítico establecido, concentrados principalmente en los sistemas hidráulico y de refrigeración. Con esta información se aplicó la lógica de decisión RCM, clasificando cada modo según sus consecuencias de seguridad, ambientales, operacionales o no operacionales, y seleccionando la política de mantenimiento técnicamente viable y rentable para cada uno; de ahí resultaron 63 tareas proactivas y 6 tareas descartadas. Estas tareas se organizaron en rutas de mantenimiento por frecuencia y responsable, se documentaron en hojas de trabajo estandarizadas por sistema, y se vincularon a un inventario de 42 repuestos y consumibles clasificados bajo el criterio VED, del cual el 55 % se catalogó como vital. Adicionalmente, se calculó la disponibilidad operativa de la inyectora sobre una base semanal (93,18 %), como indicador para la planificación del programa de mantenimiento frente a la demanda de producción, que puede presentarse en cualquier momento. Con este trabajo se logró construir un proceso RCM riguroso y trazable a partir de información escasa, dejando además una herramienta de gestión de mantenimiento que puede replicarse en otros activos de la empresa.
dc.description.abstractenglishThis project develops a preventive maintenance plan for the Welltec 190 SE II injection molding machine at Metalcort Ingeniería S.A.S., a company in the metal-mechanic sector whose critical production asset is this machine, using the Reliability-Centered Maintenance (RCM) methodology, in accordance with the SAE JA1011 and SAE JA1012 standards. To do this, the machine's hierarchical taxonomy was built first under the ISO 14224 standard, coding 40 components within their respective systems (hydraulic, electrical, electronic control, cooling, among others). Based on this taxonomy and on the corrective-failure history recorded by IMOCOM between 2019 and 2025, a Failure Mode, Effects and Criticality Analysis (FMECA) matrix was developed, identifying 69 failure modes and calculating their Risk Priority Number (RPN); 36% of the modes exceeded the established critical threshold, concentrated mainly in the hydraulic and cooling systems. With this information, the RCM decision logic was applied, classifying each failure mode according to its consequences (safety, environmental, operational or non-operational) and selecting the technically feasible and cost-effective maintenance policy for each one; this resulted in 63 proactive tasks and 6 discarded tasks. These tasks were organized into maintenance routes by frequency and responsible party, documented in standardized work sheets by system, and linked to an inventory of 42 spare parts and consumables classified under the VED criterion, of which 55% were rated as vital. Additionally, the machine's operational availability was calculated on a weekly basis (93.18%), as an indicator for planning the maintenance program against production demand, which can arise at any time. This work made it possible to build a rigorous and traceable RCM process from scarce information, leaving in addition a maintenance management tool that can be replicated for other assets of the company.
dc.description.degreelevelPregrado
dc.description.degreenameIngeniero Mecánico
dc.format.mimetypeapplication/pdf
dc.identifier.instnameUniversidad Industrial de Santander
dc.identifier.reponameUniversidad Industrial de Santander
dc.identifier.repourlhttps://noesis.uis.edu.co
dc.identifier.urihttps://noesis.uis.edu.co/handle/20.500.14071/48481
dc.language.isospa
dc.publisherUniversidad Industrial de Santander
dc.publisher.facultyFacultad de Ingeníerias Fisicomecánicas
dc.publisher.programIngeniería Mecánica
dc.publisher.schoolEscuela de Ingeniería Mecánica
dc.rightsinfo:eu-repo/semantics/openAccess
dc.rights.coarhttp://purl.org/coar/access_right/c_abf2
dc.rights.licenseAtribución-NoComercial-SinDerivadas 2.5 Colombia (CC BY-NC-ND 2.5 CO)
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/
dc.subjectMantenimiento centrado en confiabilidad (RCM)
dc.subjectFMECA
dc.subjectdisponibilidad operativa
dc.subjectplan de mantenimiento preventivo
dc.subjectinyección de plásticos
dc.subject.keywordReliability-centered maintenance (RCM)
dc.subject.keywordFMECA
dc.subject.keywordoperational availability
dc.subject.keywordpreventive maintenance plan
dc.subject.keywordplastic injection molding
dc.titleMejora del proceso de producción de la inyectora de plástico Welltec 190 SE II mediante el análisis de fallas potenciales y el desarrollo de un plan de mantenimiento que aumente el indicador de disponibilidad
dc.type.coarhttp://purl.org/coar/resource_type/c_7a1f
dc.type.hasversionhttp://purl.org/coar/version/c_b1a7d7d4d402bcce
dc.type.localTesis/Trabajo de grado - Monografía - Pregrado
dspace.entity.typePublication
local.degreee.modalityPráctica Empresarial

Archivos

Bloque original

Mostrando 1 - 3 de 3
Cargando...
Miniatura
Nombre:
Documento.pdf
Tamaño:
2.17 MB
Formato:
Adobe Portable Document Format
Cargando...
Miniatura
Nombre:
Carta de autorización.pdf
Tamaño:
91.51 KB
Formato:
Adobe Portable Document Format
Cargando...
Miniatura
Nombre:
Nota de proyecto.pdf
Tamaño:
104.19 KB
Formato:
Adobe Portable Document Format

Bloque de licencias

Mostrando 1 - 1 de 1
Cargando...
Miniatura
Nombre:
license.txt
Tamaño:
2.17 KB
Formato:
Item-specific license agreed to upon submission
Descripción:

VIGILADA MINEDUCACIÓN

Ordenanza No. 83 de 1.944 (junio 22)

Carácter académico: Universidad

Notificaciones judiciales: notjudiciales@uis.edu.co 

.

Código SNIES: 1204   Nit: 890.201.213-4

Línea Anticorrupción:  +57 (601) 562 9300 EXT: 3633

Línea transparente: +57 (607) 630 3031