Estudio y rediseño de las instalaciones eléctricas de la sede UIS-Bucarica

dc.contributor.advisorJurado Jerez, Ciro
dc.contributor.authorQuintero Vergel, Alvin Didierth
dc.contributor.authorGomez Marin, Diofer Yesith
dc.date.accessioned2024-03-03T16:36:34Z
dc.date.available2007
dc.date.available2024-03-03T16:36:34Z
dc.date.created2007
dc.date.issued2007
dc.description.abstractEn busca de solucionar los problemas y las deficiencias que presentan las instalaciones eléctricas de la Universidad Industrial de Santander (U.I.S.) y obtener la actualización de la información correspondiente a las redes de baja tensión del edificio Hotel Bucaricafl, se ha desarrollado este proyecto. El presente trabajo permite identificar las correcciones para las instalaciones y la mejor manera para llevarlas a cabo. Para realizar el estudio de las instalaciones eléctricas fueron requeridos cuatro (4) pasos: Como primera medida, la obtención de datos (1), luego un análisis de los datos recolectados (2), rediseño de las redes eléctricas (3), y después, la elaboración del respectivo presupuesto. Se realizó una actualización de los planos eléctricos existentes, de la misma manera, se monitoreó el comportamiento de la carga con la intensión de conocer el estado de las instalaciones, además, se hicieron las medidas necesarias de los niveles de iluminación en las diferentes locaciones. Fueron hechos cálculos de regulación para las redes basados en la información recolectada. Por otra parte y con el propósito de finalizar el proyecto, fue presentado el presupuesto, este presupuesto fue calculado con precios unitarios de materiales y mano de obra teniendo en cuenta los costos actuales del mercado. Todas las propuestas presentadas en este proyecto van de acuerdo con la normatividad eléctrica Colombiana vigente. Con la implementación de este proyecto se garantiza la seguridad del personal y los estudiantes que laboran en el edificio Bucaricafl, así como el buen funcionamiento de los equipos usados allí. Este es un gran esfuerzo realizado con el fin de mejorar y optimizar la infraestructura de la universidad y los servicios ofrecidos por la institución.
dc.description.abstractenglishIn order to solve the problems and lacks present in the electrical installations of the Universidad Industrial de Santander (U.I.S) and updating the information about the low tension networks, which comprise the building Hotel Bucaricafl, this project was develop. The present work allows identifying the installations corrections and the best way to perform them. To develop the study of the electrical installations four (4) steps were required: Firsthand, obtaining data (1), then an analysis of the obtained data (2), redesign of the electrical networks (3) and then elaborate its respective budget (4). An updating of the existing electrical plans were made, and a monitoring of the behavior of the load was done as well in order to figure the current state out of the installations, besides, the necessary measures of the levels of illumination were take at different kind-areas. Regulation Calculus of the networks were made based on the information gotten. On the other hand, in order to finish the project, a budget scope was presented as well; this budget was calculated with unitary values of materials and hand-labor keeping in mind the market current costs. All those proposal presented within the project are in connection with the Colombian electrical Normative. At performing this project the staff and student safety and well-working of the devices used in building Bucaricafl are guaranteed. This is a great afford done toward improving and enhancing the university infrastructure and services offered by the institution
dc.description.degreelevelPregrado
dc.description.degreenameIngeniero Electricista
dc.format.mimetypeapplication/pdf
dc.identifier.instnameUniversidad Industrial de Santander
dc.identifier.reponameUniversidad Industrial de Santander
dc.identifier.repourlhttps://noesis.uis.edu.co
dc.identifier.urihttps://noesis.uis.edu.co/handle/20.500.14071/20117
dc.language.isospa
dc.publisherUniversidad Industrial de Santander
dc.publisher.facultyFacultad de Ingenierías Fisicomecánicas
dc.publisher.programIngeniería Eléctrica
dc.publisher.schoolEscuela de Ingenierías Eléctrica, Electrónica y Telecomunicaciones
dc.rightshttp://creativecommons.org/licenses/by/4.0/
dc.rights.accessrightsinfo:eu-repo/semantics/openAccess
dc.rights.creativecommonsAtribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0)
dc.rights.licenseAttribution-NonCommercial 4.0 International (CC BY-NC 4.0)
dc.rights.urihttp://creativecommons.org/licenses/by-nc/4.0
dc.subjectInstalaciones eléctricas
dc.subjectInventario
dc.subjectEstudio
dc.subjectRediseño
dc.subjectAnálisis
dc.subjectpresupuesto.
dc.subject.keywordElectrical installations
dc.subject.keywordInventory
dc.subject.keywordStudy
dc.subject.keywordRedesign
dc.subject.keywordAnalysis
dc.subject.keywordbudget.
dc.titleEstudio y rediseño de las instalaciones eléctricas de la sede UIS-Bucarica
dc.title.englishStudy and redesign of the electrical installations of the building hotel bucaricafl of the universidad industrial de santander*
dc.type.coarhttp://purl.org/coar/version/c_b1a7d7d4d402bcce
dc.type.hasversionhttp://purl.org/coar/resource_type/c_7a1f
dc.type.localTesis/Trabajo de grado - Monografía - Pregrado
Files
Original bundle
Now showing 1 - 2 of 2
No Thumbnail Available
Name:
Documento.pdf
Size:
3.98 MB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Nota de proyecto.pdf
Size:
256.36 KB
Format:
Adobe Portable Document Format