Modelo estratégico de mantenimiento para las subestaciones y redes eléctricas de media tensión de una planta siderúrgica basado en la metodología rcm

dc.contributor.advisorWagner Arbeláez, Julio Cesar
dc.contributor.authorBernal López, Pablo Martin
dc.date.accessioned2024-03-03T20:52:02Z
dc.date.available2014
dc.date.available2024-03-03T20:52:02Z
dc.date.created2014
dc.date.issued2014
dc.description.abstractEl sistema eléctrico debe asegurar en sus diferentes niveles de tensión y consumo de corriente la mayor confiabilidad al proceso Siderúrgico: Planta Sinterizadora, Planta Coquización, Alto Horno, Aceración, Hornos de Arco, Colada Continua y Trenes Laminadores. Se han presentado interrupciones de proceso por fallas funcionales del sistema eléctrico, ocasionando pérdidas operacionales; representadas en pérdidas de material en proceso, costos de reparación y tiempos de maquina improductivos. Adicionalmente se coloca en riesgo las personas y los activos de la compañía. Por tanto se debe realizar un análisis que permita establecer una estrategia de mantenimiento centrada en confiabilidad RCM, para lograr operar el proceso minimizando las paradas por cortes de energía debidos a falla del sistema eléctrico; mediante la ejecución de tareas de mantenimiento costo-efectivas. Se decidió utilizar la metodología SRCM®, la cual cumple con los estándares establecidos por la SAE JA 1011; teniendo en cuenta que la metodología SRCM está orientada principalmente hacia las industrias de proceso e instalaciones de distribución de energía. Para los planes de mantenimiento se siguió la tendencia mundial basada en la anticipación temprana de un siniestro eléctrico, mediante la aplicación de técnicas de diagnóstico de redes y subestaciones, tendientes a controlar desde la instalación de los mismos, el tipo de falla que a futuro tendrán, cuando se constituyan como parte integrante de un tendido subterráneo o aéreo, permitiendo analizar metro a metro el estado de degradación, ya sea ascendente o estable. Se culminaron los modelos de mantenimiento para las subestaciones tipo exterior, tipo interior y las redes de media tensión; incluyendo cargue al modulo PM de SAP de la subestación principal. Ya se han ejecutado tareas planteadas en los planes de mantenimiento en temas de inspección, reacondicionamiento de condición y predictivas a subestaciones y redes de media tensión que han aumentado la disponibilidad.
dc.description.abstractenglishThe electrical system must be ensured at different levels of voltage and current consumption greater reliability to the process Steel: Sinter plant, Coking plant, blast furnace, steelmaking, Arc Furnace, Continuous Casting and Rolling Trains. There have been disruptions functional process electrical system failures, causing operating losses; represented in material losses in the process, repair costs and unproductive time machine. Additionally, people placed at risk and assets of the company. So should perform an analysis to establish a strategy for reliability centered maintenance RCM to achieve operating the minimizing process downtime from power outages due to electrical failure, through the implementation of maintenance cost-effective. We decided to use the methodology SRCM ®, which meets the standards set by the SAE JA 1011; considering that the SRCM methodology is mainly oriented towards the process industries and power distribution facilities. Maintenance plans for continued global trend from early anticipation of a power loss, by applying diagnostic techniques and substation networks, aimed at controlling since installing them, the type of fault that the future will, as they are established as part of an overhead or underground laying, meter by meter allowing analyzing the state of degradation, either rising or stable. The models were completed substations maintenance outdoor type, indoor type and medium voltage networks, including loading the SAP PM module substation main. Tasks have been executed already raised in the maintenance plans in the areas of inspection, overhaul predictive condition and substations and medium voltage networks have increased the availability.
dc.description.degreelevelEspecialización
dc.description.degreenameEspecialista en Gerencia de Mantenimiento
dc.format.mimetypeapplication/pdf
dc.identifier.instnameUniversidad Industrial de Santander
dc.identifier.reponameUniversidad Industrial de Santander
dc.identifier.repourlhttps://noesis.uis.edu.co
dc.identifier.urihttps://noesis.uis.edu.co/handle/20.500.14071/31376
dc.language.isospa
dc.publisherUniversidad Industrial de Santander
dc.publisher.facultyFacultad de Ingenierías Fisicomecánicas
dc.publisher.programEspecialización en Gerencia de Mantenimiento
dc.publisher.schoolEscuela de Ingeniería Mecánica
dc.rightshttp://creativecommons.org/licenses/by/4.0/
dc.rights.accessrightsinfo:eu-repo/semantics/openAccess
dc.rights.creativecommonsAtribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0)
dc.rights.licenseAttribution-NonCommercial 4.0 International (CC BY-NC 4.0)
dc.rights.urihttp://creativecommons.org/licenses/by-nc/4.0
dc.subjectEnergía
dc.subjectRedes
dc.subjectSubestacion
dc.subjectDisponibilidad
dc.subjectSeguridad
dc.subjectFuncion
dc.subjectFalla Funcional
dc.subjectEfecto De Falla
dc.subjectCriticidad.
dc.subject.keywordEnergy Networks
dc.subject.keywordSubstation
dc.subject.keywordAvailability
dc.subject.keywordSecurity
dc.subject.keywordFunction
dc.subject.keywordFailure Functional Effect Of Failure
dc.subject.keywordCriticality.
dc.titleModelo estratégico de mantenimiento para las subestaciones y redes eléctricas de media tensión de una planta siderúrgica basado en la metodología rcm
dc.title.englishStrategic model for substation maintenance and media networks voltage electrical steel plant based methodology rcm.
dc.type.coarhttp://purl.org/coar/version/c_b1a7d7d4d402bcce
dc.type.hasversionhttp://purl.org/coar/resource_type/c_7a1f
dc.type.localTesis/Trabajo de grado - Monografía - Pregrado
Files
Original bundle
Now showing 1 - 3 of 3
No Thumbnail Available
Name:
Carta de autorización.pdf
Size:
271.56 KB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Documento.pdf
Size:
6.06 MB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Nota de proyecto.pdf
Size:
122.13 KB
Format:
Adobe Portable Document Format