SUPERVISIÓN DE LA INSTALACIÓN ELÉCTRICA EN EL PROYECTO DE MODERNIZACIÓN DE LA FACULTAD DE SALUD DE LA UNIVERSIDAD INDUSTRIAL DE SANTANDER
dc.contributor.advisor | Rincon Saravia, Rolando Andres | |
dc.contributor.advisor | Quiroga Quiroga, Oscar Arnulfo | |
dc.contributor.author | González Jácome, Cristhian Camilo | |
dc.contributor.evaluator | Ortiz Rangel, Manuel Jose | |
dc.contributor.evaluator | Adarme Lopez, Edinson Fabian | |
dc.date.accessioned | 2025-02-24T15:28:36Z | |
dc.date.available | 2025-02-24T15:28:36Z | |
dc.date.created | 2025-02-21 | |
dc.date.issued | 2025-02-21 | |
dc.description.abstract | Se dio inicio al proyecto del edificio de modernización de la Facultad de Salud de la Universidad Industrial de Santander, donde se integraron practicantes en las áreas de Ingeniería Civil y Eléctrica con el objetivo de que adquirieran experiencia profesional y contribuyeran al desarrollo de la nueva torre hospitalaria. La supervisión de los practicantes estuvo a cargo de la División de Planta Física de la universidad. Durante un período de 4 meses, se desempeñó un rol activo en la parte eléctrica, asegurando la actualización constante de los reportes semanales y el control detallado de los planos y las cantidades de material por piso. Este trabajo permitió mantener un avance significativo en la obra. La torre hospitalaria cuenta con 5 pisos, 2 sótanos, un auditorio con capacidad destacada y 53 laboratorios, abarcando una construcción de más de 27 mil metros cuadrados. En el transcurso de estos 4 meses, se desarrolló habilidades técnicas en el manejo de software como AutoCAD, Excel, Microsoft Word, Trimble Connect y Revit, herramientas fundamentales para la revisión de planos, modelos y extracción de cantidades. Estas herramientas facilitaron la generación de reportes precisos sobre el trabajo semanal, permitiendo identificar las correcciones necesarias en la obra cuando las medidas no coincidían exactamente con los planos originales. Revit, en particular, fue clave para visualizar modelos y detectar discrepancias, asegurando que los ajustes fueran efectivos. El uso de estos programas agilizó los cálculos de ingeniería y la presentación de datos precisos en los comités, donde se debatían los avances del proyecto y se evaluaban los tiempos establecidos para cada piso y sus respectivas áreas. | |
dc.description.abstractenglish | The project for the modernization building of the Faculty of Health at the Universidad Industrial de Santander began, incorporating interns from the fields of Civil and Electrical Engineering with the aim of providing professional experience and contributing to the development of the new hospital tower. The supervision of the interns was handled by the university's Division of Physical Plant. Over a period of 4 months, I actively participated in the electrical area, ensuring the constant updating of weekly reports and the detailed monitoring of plans and material quantities per floor. This work contributed to significant progress on the project. The hospital tower consists of 5 floors, 2 basements, an auditorium with notable capacity, and 53 laboratories, encompassing a construction area of more than 27,000 square meters. Over the course of these 4 months, technical skills were developed in the use of software such as AutoCAD, Excel, Microsoft Word, Trimble Connect, and Revit, which were essential tools for reviewing plans, models, and extracting quantities. These tools facilitated the generation of accurate reports on weekly progress, allowing the identification of necessary corrections in the construction when measurements did not exactly match the original plans. Revit, in particular, was instrumental in visualizing models and detecting discrepancies, ensuring that adjustments were effectively implemented. The use of these programs streamlined engineering calculations and the presentation of precise data in committee meetings, where project progress was discussed, and timelines for each floor and their respective areas were evaluated. | |
dc.description.degreelevel | Pregrado | |
dc.description.degreename | Ingeniero Electricista | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/45068 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingeníerias Fisicomecánicas | |
dc.publisher.program | Ingeniería Eléctrica | |
dc.publisher.school | Escuela de Ingenierías Eléctrica, Electrónica y Telecomunicaciones | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Atribución-NoComercial-SinDerivadas 2.5 Colombia (CC BY-NC-ND 2.5 CO) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc-nd/4.0/ | |
dc.title | SUPERVISIÓN DE LA INSTALACIÓN ELÉCTRICA EN EL PROYECTO DE MODERNIZACIÓN DE LA FACULTAD DE SALUD DE LA UNIVERSIDAD INDUSTRIAL DE SANTANDER | |
dc.title.english | SUPERVISION OF THE ELECTRICAL INSTALLATION IN THE MODERNIZATION PROJECT OF THE FACULTY OF HEALTH AT THE UNIVERSIDAD INDUSTRIAL DE SANTANDER. | |
dc.type.coar | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 4 of 4
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 88.92 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 286.8 KB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 2.18 KB
- Format:
- Item-specific license agreed to upon submission
- Description: