Mantenimiento basado en rbi (risk based inspection) para la planta no2 de producción de polipropileno en la empresa Propilco S.A
dc.contributor.advisor | Barrios Verhelst, Javier | |
dc.contributor.author | Lobo Barrera, Fabian | |
dc.contributor.author | Márquez Castelar, Cesar | |
dc.contributor.author | Romero Sierra, Luis Alberto | |
dc.date.accessioned | 2024-03-03T20:04:47Z | |
dc.date.available | 2013 | |
dc.date.available | 2024-03-03T20:04:47Z | |
dc.date.created | 2013 | |
dc.date.issued | 2013 | |
dc.description.abstract | El presente trabajo está fundamentalmente desarrollado con la intención de brindar al lector los conocimientos básicos acerca de la implementación de un programa de mantenimiento basado en riesgo, para evitar, minimizar y mitigar las consecuencias de falla. Inicialmente se mencionan algunas generalidades de la empresa Propilco S.A relacionada con los procesos de fabricación de polipropileno. Luego se dan algunos conceptos básicos acerca del riesgo y las probabilidades de falla por su consecuencia.Tambien se menciona el porque se requiere un RBI, qué se denomina falla en RBI, los tipos de evaluación en RBI. Se realiza una breve descripción de la matriz de riesgos para determinar de que manera se evalúan los equipos, esto basado también en la norma API-580, la cual en conjunto con la API-581 dan las directrices acerca de los conceptos para la implementación de un RBI y las técnicas de aplicación del mismo. Nace por la intención de la compañía Propilco S.A en establecer la metodología apropiada en base al plan de mantenimiento actual. Se realizó la clasificación de los equipos críticos para cada proceso y se determinó los distintos mecanismos de falla, esto basado en la matriz de riesgo acorde a lo señalado en el código APIRP 580. Asi mismo se obtiene el resultado del estado actual de los equipos en el cual se menciona en que porcentaje del objeto de estudio presentan los diferentes tipos de criticidad, hallando cual de ellos se encuentran en criticidad media, alta o baja. Por último, se propone una modificación al plan actual de mantenimiento en Propilco S.A. de acuerdo con las frecuencias de mantenimiento establecidas y los análisis realizados. | |
dc.description.abstractenglish | The present work fundamentally is developed with the intention to offer to the reader the basic knowledge about the implementation of a program of maintenance based on risk, to avoid, to diminish and to mitigate the consequences of fault. At first, are some generalities Propilco SA processes related to manufacturing polypropylene. Then are some basics about risk and probability of failure for its consecuence. Also is mentioned why RBI is required , what is called failure RBI , the RBI assessment types . Is a brief description of the risk matrix to determine which way the teams are evaluated , this also based on API -580 standard, which in conjunction with the API -581 guidelines are given on the concepts for implemntación an RBI and application techniques of the same. It is born by the intention of the company Propilco S.A. in establishing the appropriate methodology on the basis of the plan of present maintenance. The classification of the critical equipment for each process was made and it determined the different mechanisms from fault, this based on the matrix of agreed risk to the indicated thing in code API-RP 580. Likewise, we get the result of the current status of the equipment in which it is mentioned in the percentage of the object of study shows the different types of criticality, finding which of them are in critical medium, high or low. Finally, a modification to the present plan of maintenance in Propilco S.A. sets out. In agreement with the frequencies of maintenance established and the made analyses. | |
dc.description.degreelevel | Especialización | |
dc.description.degreename | Especialista en Gerencia de Mantenimiento | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/28823 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
dc.publisher.program | Especialización en Gerencia de Mantenimiento | |
dc.publisher.school | Escuela de Ingeniería Mecánica | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | Inspección Basada En Riesgo | |
dc.subject | Matriz De Riesgos | |
dc.subject | Lazo De Corrosión | |
dc.subject | Probabilidad De Falla. | |
dc.subject.keyword | Risk Based Inspection | |
dc.subject.keyword | Risk Matrix | |
dc.subject.keyword | Corrosión Loop | |
dc.subject.keyword | Probability Of Failure. | |
dc.title | Mantenimiento basado en rbi (risk based inspection) para la planta no2 de producción de polipropileno en la empresa Propilco S.A | |
dc.title.english | Based maintenance rbi (risk based inspection) for n°2 plant polypropylene production at company propilco S.A. | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 622.05 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 329.35 KB
- Format:
- Adobe Portable Document Format