Optimización del plan de mantenimiento (pmo) al sistema de compresión de gas natural del campo rio ceibas
dc.contributor.advisor | Bernate Losada, Hugo Hernán | |
dc.contributor.author | Palacio Sánchez, Bayron Leandro | |
dc.contributor.author | Guzmán Roa, Fredy Alexander | |
dc.contributor.author | Torrado Zuleta, Luis Jesus | |
dc.date.accessioned | 2024-03-03T21:56:47Z | |
dc.date.available | 2015 | |
dc.date.available | 2024-03-03T21:56:47Z | |
dc.date.created | 2015 | |
dc.date.issued | 2015 | |
dc.description.abstract | Existen diferentes métodos de levantamientos para la extracción de crudo en estaciones petroleras, entre los cuales se encuentran unidad de bombeo mecánico (UBM/Machines), por medio de bombas electro sumergibles (ESP), Bombas de cavidad progresiva (PCP), por inyección de gas (gas lift), por flujo natural, entre otros. En el campo Rio Ceibas, existen 3 tipos de levantamiento, PCP, ESP y Gas lift, siendo este último el de más relevancia del campo, debido a que aproximadamente un 80% de la producción se obtiene por este medio, por lo cual el sistema de compresión de gas para la inyección, se considera un sistema critico dentro de la operación y la seguridad de la estación, debido a lo anterior se decide optimizar el plan de mantenimiento actual de este sistema Durante la recopilación de información y los talleres PMO, se evidencio que gran parte de la ejecución de mantenimiento se realiza de manera informal, por medio de la experticia de los técnicos, esto al encontrar que no todas las actividades se encuentran con estándar Job, principalmente en el área de instrumentación, el sistema de inyección de gas se encuentra compuesto por 3 equipos principales, el scrubber de suministro de gas, motor reciprocante Waukesha y compresores de gas Ariel. En este documento se encontrará el plan de mantenimiento optimizado, en base a información de manuales, experiencia propia de los autores, experticia de los técnico en la ejecución de actividades y fallas recurrente en el sistema de compresión de gas lift, durante la optimización del plan de mantenimiento, se eliminaron tareas irrelevantes y/o redundantes, agruparon tareas y se agregaron tareas para modos de fallas que no se atendían en el plan de mantenimiento actual. | |
dc.description.abstractenglish | There are different survey methods for the extraction of crude oil stations, including mechanical pumping unit (UBM / Machines) are, by means of electric submersible pumps (ESP), progressing cavity pumps (PCP), injection gas (gas lift), by natural flow, among others. In the Rio Ceibas station, there are 3 types of lift, PCP, ESP and lift gas, the latter is the most important of the station, because approximately 80% of production is obtained by this type system, so which the gas compression system for injection, is considered a critical system in the operation and safety of the station, for this it is decided optimization the current maintenance program running on this system runs During the collection of information and the PMO workshops, he showed that much of the execution of maintenance is done informally, through the expertise of technicians, this to find that not all activities are standard Job, mainly in the area of instrumentation, gas injection system is composed of 3 main equipment, supply of gas scrubber, reciprocating engine Waukesha and gas compressors Ariel. In this document going to find the maintenance plan optimized, based on information from manuals, experience of the authors, the experience of technical personal in the implementation of activities and recurring fails of gas compression system, during the maintenance plan optimization, were eliminated tasks irrelevant or redundant, clustered tasks and added for failure modes that did not were included in the current maintenance plan. | |
dc.description.degreelevel | Especialización | |
dc.description.degreename | Especialista en Gerencia de Mantenimiento | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/31959 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
dc.publisher.program | Especialización en Gerencia de Mantenimiento | |
dc.publisher.school | Escuela de Ingeniería Mecánica | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | Plan De Mantenimiento | |
dc.subject | Estándar Job | |
dc.subject | Esp | |
dc.subject | Pcp | |
dc.subject | Ubm | |
dc.subject | Gas Lift. | |
dc.subject.keyword | Maintenance Plan | |
dc.subject.keyword | Job | |
dc.subject.keyword | Esp | |
dc.subject.keyword | Pcp | |
dc.subject.keyword | Ubm | |
dc.subject.keyword | And Gas Lift Standard. | |
dc.title | Optimización del plan de mantenimiento (pmo) al sistema de compresión de gas natural del campo rio ceibas | |
dc.title.english | Optimization maintenance schedule (pmo) compression system of natural gas field of rio ceibas | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 281.96 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 450.5 KB
- Format:
- Adobe Portable Document Format