Optimización del plan de mantenimiento (pmo) al sistema de compresión de gas natural del campo rio ceibas

dc.contributor.advisorBernate Losada, Hugo Hernán
dc.contributor.authorPalacio Sánchez, Bayron Leandro
dc.contributor.authorGuzmán Roa, Fredy Alexander
dc.contributor.authorTorrado Zuleta, Luis Jesus
dc.date.accessioned2024-03-03T21:56:47Z
dc.date.available2015
dc.date.available2024-03-03T21:56:47Z
dc.date.created2015
dc.date.issued2015
dc.description.abstractExisten diferentes métodos de levantamientos para la extracción de crudo en estaciones petroleras, entre los cuales se encuentran unidad de bombeo mecánico (UBM/Machines), por medio de bombas electro sumergibles (ESP), Bombas de cavidad progresiva (PCP), por inyección de gas (gas lift), por flujo natural, entre otros. En el campo Rio Ceibas, existen 3 tipos de levantamiento, PCP, ESP y Gas lift, siendo este último el de más relevancia del campo, debido a que aproximadamente un 80% de la producción se obtiene por este medio, por lo cual el sistema de compresión de gas para la inyección, se considera un sistema critico dentro de la operación y la seguridad de la estación, debido a lo anterior se decide optimizar el plan de mantenimiento actual de este sistema Durante la recopilación de información y los talleres PMO, se evidencio que gran parte de la ejecución de mantenimiento se realiza de manera informal, por medio de la experticia de los técnicos, esto al encontrar que no todas las actividades se encuentran con estándar Job, principalmente en el área de instrumentación, el sistema de inyección de gas se encuentra compuesto por 3 equipos principales, el scrubber de suministro de gas, motor reciprocante Waukesha y compresores de gas Ariel. En este documento se encontrará el plan de mantenimiento optimizado, en base a información de manuales, experiencia propia de los autores, experticia de los técnico en la ejecución de actividades y fallas recurrente en el sistema de compresión de gas lift, durante la optimización del plan de mantenimiento, se eliminaron tareas irrelevantes y/o redundantes, agruparon tareas y se agregaron tareas para modos de fallas que no se atendían en el plan de mantenimiento actual.
dc.description.abstractenglishThere are different survey methods for the extraction of crude oil stations, including mechanical pumping unit (UBM / Machines) are, by means of electric submersible pumps (ESP), progressing cavity pumps (PCP), injection gas (gas lift), by natural flow, among others. In the Rio Ceibas station, there are 3 types of lift, PCP, ESP and lift gas, the latter is the most important of the station, because approximately 80% of production is obtained by this type system, so which the gas compression system for injection, is considered a critical system in the operation and safety of the station, for this it is decided optimization the current maintenance program running on this system runs During the collection of information and the PMO workshops, he showed that much of the execution of maintenance is done informally, through the expertise of technicians, this to find that not all activities are standard Job, mainly in the area of instrumentation, gas injection system is composed of 3 main equipment, supply of gas scrubber, reciprocating engine Waukesha and gas compressors Ariel. In this document going to find the maintenance plan optimized, based on information from manuals, experience of the authors, the experience of technical personal in the implementation of activities and recurring fails of gas compression system, during the maintenance plan optimization, were eliminated tasks irrelevant or redundant, clustered tasks and added for failure modes that did not were included in the current maintenance plan.
dc.description.degreelevelEspecialización
dc.description.degreenameEspecialista en Gerencia de Mantenimiento
dc.format.mimetypeapplication/pdf
dc.identifier.instnameUniversidad Industrial de Santander
dc.identifier.reponameUniversidad Industrial de Santander
dc.identifier.repourlhttps://noesis.uis.edu.co
dc.identifier.urihttps://noesis.uis.edu.co/handle/20.500.14071/31959
dc.language.isospa
dc.publisherUniversidad Industrial de Santander
dc.publisher.facultyFacultad de Ingenierías Fisicomecánicas
dc.publisher.programEspecialización en Gerencia de Mantenimiento
dc.publisher.schoolEscuela de Ingeniería Mecánica
dc.rightshttp://creativecommons.org/licenses/by/4.0/
dc.rights.accessrightsinfo:eu-repo/semantics/openAccess
dc.rights.creativecommonsAtribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0)
dc.rights.licenseAttribution-NonCommercial 4.0 International (CC BY-NC 4.0)
dc.rights.urihttp://creativecommons.org/licenses/by-nc/4.0
dc.subjectPlan De Mantenimiento
dc.subjectEstándar Job
dc.subjectEsp
dc.subjectPcp
dc.subjectUbm
dc.subjectGas Lift.
dc.subject.keywordMaintenance Plan
dc.subject.keywordJob
dc.subject.keywordEsp
dc.subject.keywordPcp
dc.subject.keywordUbm
dc.subject.keywordAnd Gas Lift Standard.
dc.titleOptimización del plan de mantenimiento (pmo) al sistema de compresión de gas natural del campo rio ceibas
dc.title.englishOptimization maintenance schedule (pmo) compression system of natural gas field of rio ceibas
dc.type.coarhttp://purl.org/coar/version/c_b1a7d7d4d402bcce
dc.type.hasversionhttp://purl.org/coar/resource_type/c_7a1f
dc.type.localTesis/Trabajo de grado - Monografía - Pregrado
Files
Original bundle
Now showing 1 - 3 of 3
No Thumbnail Available
Name:
Carta de autorización.pdf
Size:
281.96 KB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Documento.pdf
Size:
2.9 MB
Format:
Adobe Portable Document Format
No Thumbnail Available
Name:
Nota de proyecto.pdf
Size:
450.5 KB
Format:
Adobe Portable Document Format