Piloto de mantenimiento basado en la confiabilidad rcm para el transformador de potencia de 10 mva de la subestación Arauca de la Empresa de Energía de Arauca Enelar E.S.P.
dc.contributor.advisor | Garzón Wilches, José Luis | |
dc.contributor.author | Acevedo Anchicoque, Opner Benjamín | |
dc.date.accessioned | 2024-03-04T00:52:50Z | |
dc.date.available | 2020 | |
dc.date.available | 2024-03-04T00:52:50Z | |
dc.date.created | 2020 | |
dc.date.issued | 2020 | |
dc.description.abstract | Esta monografía muestra el diseño de un piloto de mantenimiento basado en la confiabilidad RCM para el transformador de potencia de 10 MVA de la subestación Arauca de la empresa de energía de Arauca ENELAR E.S.P. Tiene como propósito alcanzar las metas de disponibilidad operacional y confiabilidad del servicio sugeridas para este equipo cumpliendo con la normatividad establecida por la Comisión de Regulación de Energía y Gas, con el fin de conseguir la satisfacción de las partes interesadas que conforman esta organización. Se expone en primer lugar la historia de ENELAR E.S.P., su misión, visión, valores corporativos y sistemas de gestión implementado para el control de calidad de sus procesos. También se describe brevemente como se encuentra constituido el sistema eléctrico de la empresa. Luego se relacionan los equipos que componen una subestación eléctrica, sus funciones y clasificaciones de acuerdo a su construcción, diseño, uso del activo, entre otras. Posteriormente se describe la organización actual del mantenimiento de equipos del sistema de alta tensión, las estrategias, el recurso humano involucrado, los indicadores que caracterizan el proceso y se realiza un análisis histórico de fallas en equipos para determinar sobre cuál de ellos se concentrara el análisis de esta investigación. Seguidamente se prosigue con la evolución y etapas del mantenimiento y se hace énfasis en el mantenimiento centrado en la garantía de funcionamiento o también llamado RCM, las preguntas básicas, el contexto operacional, y los grupos de análisis. Por último, se analiza la estrategia para el diseño del modelo de mantenimiento centrado en la confiabilidad al transformador de potencia estableciendo el contexto operacional, basados en la información recopilada en el análisis de los modos y efectos de las fallas, en las hojas de información y de decisión, con el fin de diseñar las tareas proactivas a seguir. | |
dc.description.abstractenglish | This monograph shows the design of a maintenance pilot based on RCM reliability for the 10 MVA power transformer of the Arauca substation of the Arauca energy company ENELAR E.S.P. Its purpose is to achieve the goals of operational availability and service reliability suggested for this equipment, complying with the regulations established by the Energy and Gas Regulation Commission, in order to achieve the satisfaction of the interested parties that make up this organization. First, the history of ENELAR E.S.P., its mission, vision, corporate values and management systems implemented for the quality control of its processes is exposed. It is also briefly described how the electrical system of the company is constituted. Then the equipment that makes up an electrical substation, their functions and classifications according to their construction, design, use of the asset, among others, are listed. Subsequently, the current organization of the maintenance of equipment of the high voltage system is described, the strategies, the human resources involved, the indicators that characterize the process and a historical analysis of equipment failures is carried out to determine on which of them the analysis will focus. of this research. Next, the evolution and maintenance stages are continued and emphasis is placed on maintenance focused on the guarantee of operation or also called RCM, the basic questions, the operational context, and the analysis groups. Finally, the strategy for the design of the maintenance model focused on the reliability of the power transformer is analyzed, establishing the operational context, based on the information collected in the analysis of the modes and effects of the failures, in the information sheets and decision, in order to design the proactive tasks to follow. | |
dc.description.degreelevel | Especialización | |
dc.description.degreename | Especialista en Gerencia de Mantenimiento | |
dc.format.mimetype | application/pdf | |
dc.identifier.instname | Universidad Industrial de Santander | |
dc.identifier.reponame | Universidad Industrial de Santander | |
dc.identifier.repourl | https://noesis.uis.edu.co | |
dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/40745 | |
dc.language.iso | spa | |
dc.publisher | Universidad Industrial de Santander | |
dc.publisher.faculty | Facultad de Ingenierías Fisicomecánicas | |
dc.publisher.program | Especialización en Gerencia de Mantenimiento | |
dc.publisher.school | Escuela de Ingeniería Mecánica | |
dc.rights | http://creativecommons.org/licenses/by/4.0/ | |
dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
dc.rights.license | Attribution-NonCommercial 4.0 International (CC BY-NC 4.0) | |
dc.rights.uri | http://creativecommons.org/licenses/by-nc/4.0 | |
dc.subject | Subestaciones | |
dc.subject | Mantenimiento | |
dc.subject | Basado | |
dc.subject | Confiabilidad | |
dc.subject | Transformadores | |
dc.subject | Alta | |
dc.subject | Media | |
dc.subject | Tensión | |
dc.subject | Modo de Falla y Efecto de Falla | |
dc.subject.keyword | Substations | |
dc.subject.keyword | Maintenance | |
dc.subject.keyword | Based | |
dc.subject.keyword | Reliability | |
dc.subject.keyword | Transformers | |
dc.subject.keyword | High | |
dc.subject.keyword | Medium | |
dc.subject.keyword | Voltage | |
dc.subject.keyword | Failure Mode and Failure Effect | |
dc.title | Piloto de mantenimiento basado en la confiabilidad rcm para el transformador de potencia de 10 mva de la subestación Arauca de la Empresa de Energía de Arauca Enelar E.S.P. | |
dc.title.english | Maintenance pilot based on rcm reliability for the 10 mva power transformer at the arauca substation of the arauca energy company enelar e.s.p.* | |
dc.type.coar | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
dc.type.hasversion | http://purl.org/coar/resource_type/c_7a1f | |
dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado |
Files
Original bundle
1 - 3 of 3
No Thumbnail Available
- Name:
- Carta de autorización.pdf
- Size:
- 74.8 KB
- Format:
- Adobe Portable Document Format
No Thumbnail Available
- Name:
- Nota de proyecto.pdf
- Size:
- 236.98 KB
- Format:
- Adobe Portable Document Format