Publicación: Auxiliar de ingeniería para la supervisión técnica y administrativa de la obra civil de la línea de distribución eléctrica Mogotes y la subestación eléctrica del proyecto Yariguíes en el área de proyectos de la Electrificadora de Santander.
| dc.contributor.advisor | Tijo Lopez, Silvia Juliana | |
| dc.contributor.author | Fuentes Alarcón, Jhonatan Alexander | |
| dc.contributor.evaluator | Mejia Aguilar, Guillermo | |
| dc.contributor.evaluator | Martinez Estupiñan, Yerly Fabian | |
| dc.date.accessioned | 2025-11-24T12:52:56Z | |
| dc.date.available | 2025-11-24T12:52:56Z | |
| dc.date.created | 2025-11-23 | |
| dc.date.issued | 2025-11-23 | |
| dc.description.abstract | Este trabajo se enfocó en el apoyo a la supervisión técnica y administrativa de los proyectos de construcción de la línea de distribución eléctrica realizada en Mogotes y la subestación eléctrica Yariguíes realizada en Barrancabermeja de la ESSA. A través de una metodología estructurada en tres fases (Revisión y análisis de planos y documentos técnicos, Implementación y uso de herramientas de control y seguimiento, Supervisión de calidad de materiales y ensayos de laboratorio) se logró garantizar el cumplimiento de estándares técnicos y normativos y plazos establecidos. Se implementaron herramientas de control para el seguimiento en el avance de obra con cantidades y calidad de los materiales, lo que permitió identificar desfases en los tiempos establecidos para el cumplimiento de las actividades a tiempo o garantizando que las actividades se realicen en el menor tiempo. En la fase de revisión y análisis de planos y documentos técnicos, se revisaron planos, actividades, cantidades, especificaciones técnicas y la programación de cada una de las actividades a realizar. En la fase de implementación y uso de herramientas de control y seguimiento, se elaboraron herramientas ofimáticas para llevar un control de actividades realizadas semana a semana y del avance de cantidades desarrolladas, permitiendo identificar retrasos y aplicar medidas correctivas para que los proyectos estén dentro de los plazos establecidos. De igual forma, en la fase de supervisión de calidad de materiales y ensayos de laboratorio, con base en los resultados obtenidos, se garantizó que los materiales, incluido el concreto vaciado en sitio, cumplieran con las normativas vigentes y las condiciones establecidas en el diseño. Este trabajo realizado en la Electrificadora de Santander aporta una base para la mejora continua de los procesos de supervisión técnica y administrativa de proyectos de obra civil. | |
| dc.description.abstractenglish | This work focused on supporting the technical and administrative supervision of the construction projects of the electrical distribution line carried out in Mogotes and the Yariguíes electrical substation built in Barrancabermeja by ESSA. Through a methodology structured in three phases (Review and analysis of drawings and technical documents, Implementation and use of control and monitoring tools, Supervision of material quality and laboratory testing), it was possible to ensure compliance with technical and regulatory standards as well as established deadlines. Control tools were implemented to monitor project progress regarding quantities and material quality, which made it possible to identify deviations from the planned schedule and guarantee that activities were completed on time or in the shortest possible timeframe. In the review and analysis phase of drawings and technical documents, plans, activities, quantities, technical specifications, and the scheduling of each task to be carried out were examined. In the implementation and use of control and monitoring tools phase, office-based tools were developed to maintain a weekly record of the activities performed and the progress of executed quantities, allowing the identification of delays and the application of corrective measures to keep the projects within the established timeframe. Similarly, in the supervision of material quality and laboratory testing phase, based on the results obtained, it was ensured that the materials, including the cast-in-place concrete complied with current regulations and the conditions established in the design. This work carried out at Electrificadora de Santander provides a foundation for the continuous improvement of technical and administrative supervision processes in civil works projects. | |
| dc.description.degreelevel | Pregrado | |
| dc.description.degreename | Ingeniero Civil | |
| dc.format.mimetype | application/pdf | |
| dc.identifier.instname | Universidad Industrial de Santander | |
| dc.identifier.reponame | Universidad Industrial de Santander | |
| dc.identifier.repourl | https://noesis.uis.edu.co | |
| dc.identifier.uri | https://noesis.uis.edu.co/handle/20.500.14071/46668 | |
| dc.language.iso | spa | |
| dc.publisher | Universidad Industrial de Santander | |
| dc.publisher.faculty | Facultad de Ingeníerias Fisicomecánicas | |
| dc.publisher.program | Ingeniería Civil | |
| dc.publisher.school | Escuela de Ingenieria Civil | |
| dc.rights | info:eu-repo/semantics/openAccess | |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | |
| dc.rights.coar | http://purl.org/coar/access_right/c_abf2 | |
| dc.rights.creativecommons | Atribución-NoComercial-SinDerivadas 4.0 Internacional (CC BY-NC-ND 4.0) | |
| dc.rights.license | Atribución-NoComercial-SinDerivadas 2.5 Colombia (CC BY-NC-ND 2.5 CO) | |
| dc.rights.uri | https://creativecommons.org/licenses/by-nc-nd/4.0/ | |
| dc.subject | Supervisión técnica | |
| dc.subject | Obra civil | |
| dc.subject | Subestación eléctrica | |
| dc.subject | Control de calidad | |
| dc.subject | Línea de distribución | |
| dc.subject.keyword | Technical supervision | |
| dc.subject.keyword | Civil works | |
| dc.subject.keyword | Electrical substation | |
| dc.subject.keyword | Quality control | |
| dc.subject.keyword | Distribution line | |
| dc.title | Auxiliar de ingeniería para la supervisión técnica y administrativa de la obra civil de la línea de distribución eléctrica Mogotes y la subestación eléctrica del proyecto Yariguíes en el área de proyectos de la Electrificadora de Santander. | |
| dc.title.english | Engineering assistant for the technical and administrative supervision of the civil works of the Mogotes electrical distribution line and the electrical substation of the Yariguíes project in the projects area of the Electrificadora de Santander. | |
| dc.type.coar | http://purl.org/coar/resource_type/c_7a1f | |
| dc.type.hasversion | http://purl.org/coar/version/c_b1a7d7d4d402bcce | |
| dc.type.local | Tesis/Trabajo de grado - Monografía - Pregrado | |
| dspace.entity.type | Publication |
Archivos
Bloque original
1 - 3 de 3
Cargando...
- Nombre:
- Carta de autorización.pdf
- Tamaño:
- 155.79 KB
- Formato:
- Adobe Portable Document Format
Cargando...
- Nombre:
- Nota de Proyecto.pdf
- Tamaño:
- 293.66 KB
- Formato:
- Adobe Portable Document Format
Bloque de licencias
1 - 1 de 1
Cargando...
- Nombre:
- license.txt
- Tamaño:
- 2.17 KB
- Formato:
- Item-specific license agreed to upon submission
- Descripción: